Use the search options below to find decisions.
Alternatively you can view delegated decisions that have been taken by individual councillors in relation to council officers under the Scheme of Delegation to Officers:
Key Decision definition for Lancashire County Council:
A key decision means an executive decision which is likely:
(a) to result in the council incurring expenditure which is, or the making of savings which are significant having regard to the council's budget for the service or function which the decision relates; or
(b) to be significant in terms of its effects on communities living or working in an area comprising two or more wards or electoral divisions in the area of the council.
For the purposes of (a) above, the threshold for "significant" is £1.9 million (from 21 May 2026).
Key Decision definition for the Lancashire Combined County Authority:
A definition of a Key decision for the Lancashire Combined County Authority can be found on our Key definition webpage.
These proposals form part of the Levelling Up East Lancashire
project. They aim to deliver improvements in local neighbourhoods
through:
• Improving local streets with better connections
through new or improved crossing facilities and
pathways.
• Enhancing streets and public spaces with new planting
and seating.
• Creating safer street environments that makes it
easier for people to walk, cycle or wheel to local
places.
• Improving facilities at local parks and providing new
public green spaces.
• Improving road safety by discouraging pavement parking
at junctions,
• Improving sight lines for people trying to cross the
road and reducing traffic speeds.
The proposals will work together to create a safer
environment for pedestrians, cyclists, and vulnerable users, whilst
also improving public realm in the area. The intention of the
scheme is twofold, to:
• Foster a sense of pride in local communities by
creating safer, greener neighbourhoods and revitalised public
realm.
• Increase active travel uptake to improve health and
wellbeing and reduce health inequalities.
These proposals include the following:
• One Way system and small section of prohibition of
driving to be introduced to avoid an existing conflict of vehicles
and direct local traffic via a safer means of reaching main
arterial roads
Consultations
Formal consultation was carried out between 26 June 2026 and
24 July 2026which included advertising in the local press and
notices being displayed on site. Divisional county councillors were
consulted along with the council's usual consultees and the
consultation documents posted on the council's
website.
Following formal consultation No Objections were
received.
Decision Maker: Director of Highways and Transport
Decision published: 13/11/2026
Effective from: 05/11/2026
Decision:
Peter Bell, Highway Regulation Manager, took the decision to approve the proposals form part of the Levelling Up East Lancashire project that aim to deliver improvements in local neighbourhoods.
The proposals will work together to create a safer environment for pedestrians, cyclists, and vulnerable users, whilst also improving public realm in the area.
Divisions affected: Burnley North East;
Lead officer: Peter Bell
A decision to approve the commencement of a mini competition exercise carried at from the M&E Consultancy Design Framework at Various Sites - Condition Led Works
Decision Maker: Director of Growth and Property
Decision published: 13/11/2026
Effective from: 22/10/2026
Decision:
Scott Smith, Building Group Manager, Property took the decision which has been delegated to him in accordance with the Council's Directorate Schemes of Delegation for the approval of the commencement of a M&E Consultancy Design Framework Mini Competition exercise to be published via Oracle Fusion for works at Various Sites – Condition Led Works.
Mini Competition was issued to all Suppliers from the M&E Consultancy Framework
The estimated value of the Mini Competition is £440,000
Divisions affected: (All Divisions);
Lead officer: Scott Smith
These proposals
form part of the Levelling Up East Lancashire project. They aim to
deliver improvements in local neighbourhoods through:
• Improving local streets with better connections
through new or improved crossing facilities and
pathways.
• Enhancing streets and public spaces with new planting
and seating.
• Creating safer street environments that makes it
easier for people to walk, cycle or wheel to local
places.
• Improving facilities at local parks and providing new
public green spaces.
• Improving road safety by discouraging pavement parking
at junctions,
• Improving sight lines for people trying to cross the
road and reducing traffic speeds.
The proposals will work together to create a safer
environment for pedestrians, cyclists, and vulnerable users, whilst
also improving public realm in the area. The intention of the
scheme is twofold, to:
• Foster a sense of pride in local communities by
creating safer, greener neighbourhoods and revitalised public
realm.
• Increase active travel uptake to improve health and
wellbeing and reduce health inequalities.
These proposals include the following:
Road humps, raised pedestrian crossing points and raised
junction tables to reduce vehicle
Consultations
Formal consultation was carried out between 26 June 2026 and
24 July 2026 which included advertising in the local press and
notices being displayed on site. Divisional county councillors were
consulted along with the council's usual consultees and the
consultation documents posted on the council's
website.
Following formal consultation 2 Objections were received. The
main points raised in the responses along with Officer comments are
outlines in Appendix C.
Decision Maker: Director of Highways and Transport
Decision published: 13/11/2026
Effective from: 05/11/2026
Decision:
Peter Bell, Highway Regulation Manager, took the decisions to go ahead with the proposals form part of the Levelling Up East Lancashire project.
These proposals include the following: Road humps, raised pedestrian crossing points and raised junction tables to reduce vehicle
Divisions affected: Burnley North East;
Lead officer: Peter Bell
A decision on the Extension of Contract for the Provision of Hot Drinks Machines and Associated Consumables
Decision Maker: Director of Growth and Property
Decision published: 06/11/2026
Effective from: 12/10/2026
Decision:
Simon Lawrence, Director of Growth and Property has taken a decision as set out in the report.
Divisions affected: (All Divisions);
Lead officer: Simon Lawrence
Request to publish a tender for The Supply of Commercial Refrigeration and Freezer Equipment.
The equipment is primarily used within schools, colleges and other Council establishments where the safe storage of food products is required. The current contract is due to expire on 31 January 2027, and a replacement contract is required to ensure continuity of supply. The proposed contract will commence on 1 February 2027 for an initial period of two years, with the option to extend for up to a further two years.
The anticipated spend is approximately £100,000 per annum based on existing usage information, therefore the total spend is estimated to be approximately £400,000.
Decision Maker: Director of Growth and Property
Decision published: 06/11/2026
Effective from: 14/10/2026
Decision:
Clare Joynson, Head of Facilities Management has taken a decision to approve the Decision to tender - The Supply of Commercial Refrigeration and Freezer Equipment.
Divisions affected: (All Divisions);
Lead officer: Clare Joynson
These proposals form part of the Levelling Up East Lancashire
project. They aim to deliver improvements in local neighbourhoods
through:
• Improving local streets with better connections
through new or improved crossing facilities and
pathways.
• Enhancing streets and public spaces with new planting
and seating.
• Creating safer street environments that makes it
easier for people to walk, cycle or wheel to local
places.
• Improving facilities at local parks and providing new
public green spaces.
• Improving road safety by discouraging pavement parking
at junctions,
• Improving sight lines for people trying to cross the
road and reducing traffic speeds.
The proposals will work together to create a safer
environment for pedestrians, cyclists, and vulnerable users, whilst
also improving public realm in the area. The intention of the
scheme is twofold, to:
• Foster a sense of pride in local communities by
creating safer, greener neighbourhoods and revitalised public
realm.
• Increase active travel uptake to improve health and
wellbeing and reduce health inequalities.
These proposals include the following:
• Removal and reinstatement of the existing puffin
crossing on Albert Road at an increased length to improve safety.
The revised arrangement will enhance pedestrian safety by improving
crossing conditions and reducing the potential for conflict with
vehicular traffic.
Consultations
Formal consultation was carried out between 11th September
2026 and 9th October 2026. which included advertising in the local
press and notices being displayed on site. Divisional county
councillors were consulted along with the council's usual
consultees and the consultation documents posted on the council's
website.
Following formal consultation No Objections were
received.
Decision Maker: Director of Highways and Transport
Decision published: 06/11/2026
Effective from: 29/10/2026
Decision:
Peter Bell, Highway Regulation Manager has taken a decision to approve the LANCASHIRE COUNTY COUNCIL (ALBERT ROAD, LORD STREET AND NORTH VALLEY ROAD, COLNE, PENDLE BOROUGH) (REMOVAL AND INTRODUCTION OF PEDESTRIAN CROSSINGS) Legal Reference: LSG4/105844/AFR
Divisions affected: Pendle Central;
Lead officer: Peter Bell
Appendix C
outlines the requirements for this proposal
Consultations
Formal consultation was carried out between 11th September
2026 and 9th October 2026.which included advertising in the local
press and notices being displayed on site. Divisional county
councillors were consulted along with the council's usual
consultees and the consultation documents posted on the council's
website.
Following formal consultation No Objections were
received.
Decision Maker: Director of Highways and Transport
Decision published: 06/11/2026
Effective from: 29/10/2026
Decision:
Peter Bell, Highway Regulation Manager has taken a decision to approve the Lancashire County Council (Various Locations, Colne, Pendle Borough) (Various Moving Restrictions) Order 202* Legal Reference: LSG4/105846/AFR
Divisions affected: Pendle Central;
Lead officer: Peter Bell
Requirements of the proposal are outlined in Appendix
C
Consultations
Formal consultation was carried out between 11th September
2026 and 9th October 2026 which included advertising in the local
press and notices being displayed on site. Divisional county
councillors were consulted along with the council's usual
consultees and the consultation documents posted on the council's
website.
Following formal consultation No Objections were
received.
Decision Maker: Director of Highways and Transport
Decision published: 06/11/2026
Effective from: 29/10/2026
Decision:
Peter Bell, Highway Regulation Manager has taken a decision to approve the Lancashire County Council (Various Locations, Colne, Pendle Borough) (Revocation, Amendment To Permit Parking And Various Parking Restrictions) Order 202* Legal Reference: LSG4/105847/AFR
Divisions affected: Pendle Central;
Lead officer: Peter Bell
The proposals
are being pursued as part of a Section 278 agreement under the
Highways Act 1980. These proposals are being funded fully by the
developer and are linked to the new housing development and
associated planning conditions.
The junction tables and speed hump will highlight the new
site access will reduce the speed limit along Sandy Lane and Bartle
Lane in the interest of highway safety for all users and help
mitigate against the impact of increased traffic resulting from the
new development.
Consultations
Formal consultation was carried out between 11th September
2026 and 9th October 2026.which included advertising in the local
press and notices being displayed on site. Divisional county
councillors were consulted along with the council's usual
consultees and the consultation documents posted on the council's
website.
Following formal consultation No Objections were
received.
Decision Maker: Director of Highways and Transport
Decision published: 06/11/2026
Effective from: 29/10/2026
Decision:
Peter Bell, Highway Regulation Manager has taken a decision to approve the Lancashire County Council (Sandy Lane, Woodplumpton, Preston City) (Road Humps) Legal Reference: LSG4/105900/AFR
Divisions affected: Preston Rural;
Lead officer: Peter Bell
Award of Tender
for the provision of Manned Guarding, Front of House &
Security
Concierge Services.
Decision Maker: Executive Director of Place
Decision published: 06/11/2026
Effective from: 22/10/2026
Decision:
Clare Joynson, Head of Facilities Management has taken a decision as set out in the report.
Divisions affected: (All Divisions);
Lead officer: Clare Joynson
A decision on the Approval to Award Contract - Preparation and Support for Preston Western Distribution Road.
Decision Maker: Director of Highways and Transport
Decision published: 06/11/2026
Effective from: 22/10/2026
Decision:
John Davies, Director of Highways and Transport has taken a decision as set out in the report.
Divisions affected: (All Divisions);
Lead officer: John Davies
Request to approve the publication of a tender for the provision of an Adult Cycle Programme
The Adult Cycle Programme supports Lancashire County Council's ambitions to increase levels of cycling participation, improve public health outcomes, promote active travel and support sustainable transport choices across Lancashire. The programme provides a structured pathway enabling adults aged 16 years and over to develop cycling skills, confidence and access to suitable equipment.
The existing programme is approaching the end of its current contractual arrangements and requires re-procurement to ensure continuity of provision from April 2027 onwards. The proposed procurement will establish a new four-year contract delivered through six service lots covering cycle training, bike maintenance and repair, cycle hire and leasing, led rides, cycle-centred events and electrically assisted pedal cycle activities.
The proposed structure comprises six service lots:
1. Adult Cycle Training.
2. Bike Repair & Maintenance.
3. Cycle Hire/Lease Scheme and Try-a-bike.
4. Led Rides Programme
5. Cycle-Centred Events and Dr Bike.
6. E Bike Activities
Each lot will contain district-based sub-lots to allow suppliers to bid for:
• Individual districts.
• Multiple districts.
• Entire service lots.
• Single or Multiple service lots.
This structure reflects current market capability and delivery, promotes SME participation, reduces barriers to entry and allows specialist organisations to compete only for those services and geographical areas they are capable of delivering.
The anticipated spend is approximately £200,000 per annum based on existing usage information.
Decision Maker: Director of Highways and Transport
Decision published: 06/11/2026
Effective from: 30/10/2026
Decision:
John Davies, Director of Highways and Transport has taken a decision to approve the Provision Of Adult Cycle Programme.
Divisions affected: (All Divisions);
Lead officer: John Davies
Lancashire
County Council, together with other relevant local authorities, has
a statutory duty under Section 89 of the Countryside and Rights of
Way Act 2000 to prepare, publish and review Management Plans for
Protected Landscapes within its administrative area. Lancashire
County Council has statutory responsibilities for the Forest of
Bowland National Landscape and the Arnside & Silverdale
National Landscape, working jointly with other local authorities
through the respective National Landscape
Partnerships.
The revised Management Plans for the period 2026 -2031 have
been prepared by the respective National Landscape Partnerships
following stakeholder engagement and public consultation. They
establish the framework for conserving and enhancing the natural
beauty, biodiversity, cultural heritage and special qualities of
these nationally important protected landscapes over the next five
years.
Decision Maker: Director of Environment and Regulatory
Decision published: 06/11/2026
Effective from: 23/10/2026
Decision:
Jonathan Edwards, Director of Environment & Regulatory has taken a decision to approve the Adoption of Revised National Landscape Management Plans for Forest of Bowland and Arnside & Silverdale National Landscapes.
Divisions affected: Lancaster Rural East; Lancaster Rural North; Longridge with Bowland; Pendle Hill; Pendle Rural; Preston Rural; Ribble Valley North East; Ribble Valley South West; Wyre Rural East;
Lead officer: Jonathan Edwards
Approval to commence procurement for the supply of EPOS hardware and software
Decision Maker: Director of Digital
Decision published: 06/11/2026
Effective from: 03/11/2026
Decision:
Carol Groom, Head of Digital Commissioning has taken a decision as set out in the report.
Divisions affected: (All Divisions);
Lead officer: Carol Groom
A decision to approve the award from the Construction Partnering Framework exercise carried out at Castleford Residential Care Home, Clitheroe
Decision Maker: Director of Growth and Property
Decision published: 06/11/2026
Effective from: 14/10/2026
Decision:
Paul Foster, Construction and Programming Manager has taken a decision as set out in the report.
Divisions affected: Clitheroe;
Lead officer: Paul Foster (LCC)
Connect & Respect contract 01/04/2026 to 31/03/2027 - approval at PHLT 02/11/2026 to extend contract by 3 months therefore contract start 01/04/2026, contract end 30/06/2027
Decision Maker: Director of Public Health, Wellbeing and Communities
Decision published: 06/11/2026
Effective from: 02/11/2026
Decision:
Dr. Sakthi Karunanithi, Director of Public Health has taken a decision to approve the PHLT 021126 Tem 18 cmsn decision connect & respect healthy relationships prog.
Divisions affected: (All Divisions);
Lead officer: Dr Sakthi Karunanithi
Approval to award Skills Bootcamp Wave 7 Direct Award Contracts
Decision Maker: Director of Growth and Property
Decision published: 06/11/2026
Effective from: 03/11/2026
Decision:
Simon Lawrence, Director of Growth and Regeneration has taken a decision as set out in the report.
Divisions affected: N/A;
Lead officer: Simon Lawrence
These proposals
form part of the Levelling Up East Lancashire project. They aim to
deliver improvements in local neighbourhoods through:
• Improving local streets with better connections
through new or improved crossing facilities and
pathways.
• Enhancing streets and public spaces with new planting
and seating.
• Creating safer street environments that makes it
easier for people to walk, cycle or wheel to local
places.
• Improving facilities at local parks and providing new
public green spaces.
• Improving road safety by discouraging pavement parking
at junctions,
• Improving sight lines for people trying to cross the
road and reducing traffic speeds.
The proposals will work together to create a safer
environment for pedestrians, cyclists, and vulnerable users, whilst
also improving public realm in the area. The intention of the
scheme is twofold, to:
• Foster a sense of pride in local communities by
creating safer, greener neighbourhoods and revitalised public
realm.
• Increase active travel uptake to improve health and
wellbeing and reduce health inequalities.
These proposals include the following:
• Introduction of a speed cushion and raised tables to
reduce vehicle speeds and improve road safety particularly for
pedestrians and vulnerable road users.
Consultations
Formal consultation was carried out between 11th September
2026 and 9th October 2026 which included advertising in the local
press and notices being displayed on site. Divisional county
councillors were consulted along with the council's usual
consultees and the consultation documents posted on the council's
website.
Following formal consultation No Objections were
received
Decision Maker: Director of Highways and Transport
Decision published: 06/11/2026
Effective from: 29/10/2026
Decision:
Peter Bell, Highway Regulation Manager has taken a decision to approve the Lancashire County Council (Fothergill Street, Guyskye, Princess Street And Queen Street, Colne, Pendle Borough) (Road Humps) Legal Reference: LSG4/105845/AFR
Divisions affected: Pendle Central;
Lead officer: Peter Bell
Decision Maker: Cabinet
Made at meeting: 05/11/2026 - Cabinet
Decision published: 05/11/2026
Effective from: 05/11/2026
Decision:
Resolved: That under Section 100A(4) of the Local Government Act 1972, the press and public be excluded from the meeting during consideration of the following item of business on the grounds that there would be a likely disclosure of exempt information as defined in the appropriate paragraph of Part I of Schedule 12A to the Local Government Act 1972.
Decisions taken on development control matters by the Director of Environment and Planning in accordance with the County Council's Scheme of Delegation
Decision Maker: Development Control Committee
Made at meeting: 14/10/2026 - Development Control Committee
Decision published: 05/11/2026
Effective from: 14/10/2026
Decision:
A report was presented providing an update on decisions taken on development control matters by the Director of Environment and Regulatory, in accordance with the county council's Scheme of Delegation.
Resolved: That the report be noted.
Divisions affected: (All Divisions);
Lead officer: Susan Hurst
To advise the Development Control Committee of the introduction of the statutory National Scheme of Delegation of Planning Functions
Decision Maker: Development Control Committee
Made at meeting: 14/10/2026 - Development Control Committee
Decision published: 05/11/2026
Effective from: 14/10/2026
Decision:
A report was presented advising the Committee of the introduction of the statutory National Scheme of Delegation of Planning Functions, which had been incorporated into the Committee's Terms of Reference and Constitution, in order to comply with the regulatory deadline of 31 October 2026.
Resolved: The Committee noted:
(i) The introduction of the National Scheme of Delegation of Planning Functions under sections 319ZZC to 319ZZF of the Town and Country Planning Act 1990 and the Town and Country Planning (Discharge of Local Planning Authority Functions) (England) Regulations 2026.
(ii) That the constitution and Development Control Committee Terms of Reference had been updated and approved by the Director of Law and Governance in accordance with Reserved Power 16, to comply with the National Scheme of Delegation of Planning Functions from the 31 October 2026, as attached at Appendix 'C'.
Divisions affected: (All Divisions);
Lead officer: Rob Hope
Erection of a
bagging plant building (B2) and siting of external wash plant in
association with existing glass recycling centre (part
retrospective).
Decision Maker: Development Control Committee
Made at meeting: 14/10/2026 - Development Control Committee
Decision published: 05/11/2026
Effective from: 14/10/2026
Decision:
A report was presented on an application for the erection of a bagging plant building (B2) at the former Westby Brickworks and the siting of an external wash plant in association with the existing glass recycling centre (part retrospective). Item 6 on the agenda was a separate, but closely linked application at the former Westby Brickworks, associated with the variation of conditions.
A revised Powerpoint presentation including updated photographs of the bagging plant building and a copy of the original planning permission had been circulated to members prior to the meeting (copies attached) and paper copies provided at the meeting.
The report included the views of Westby-with-Plumptons Parish Council, County Councillor John Singleton, the Environment Agency and Lancashire County Council Highways Development Control. Three representations objecting to the application had been received, the details of which were set out in the Committee report.
No comments had been received from Fylde Borough Council or the Lead Local Flood Authority.
The Senior Planning Officer presented a Powerpoint presentation (which also related to Item 6 on the agenda), showing site location plans and an aerial view of the site, location of the proposed building and wash plant, elevations, location of the Biological Heritage Site at Lytham Moss and a plan showing the distance between the planning application boundary and no.3 Archers Farm (nearest dwelling). Also shown were photographs of the site looking south east showing the wash plant, looking south east at the proposed new bagging plant building, looking south from within the site to the existing building and the bagging plant building.
A representation was made by Denise Hollowell, local resident. A summary of the representation is as follows: the representation can be viewed in full at the webcast link here
• HGVs pass my house 3 feet from the road.
• I can hear the machinery in the yard clunking, banging and squeaking.
• I would ask that the conditions to protect my and the local residents amenity remain in situ without change.
• The conveyor belt should be housed in a building. This would resolve the dust issues and ameliorate the noise.
• An acrid hot plume blows across the area in certain weather conditions.
• Pleased to see that the drainage will be improved. Annas Road is permanently flooded, even during dry weather. Two drains are completely blocked with glass from the recycling centre, dust, mud etc.
The officers answered questions from Committee.
Committee were advised that their concerns around noise, dust, traffic, drainage and the applicant's alleged breaches of planning conditions would be discussed under Item 6 on the agenda, as that application was in relation to the use of the site.
Resolved: That planning permission be granted, subject to the conditions set out in Appendix 'A'.
Divisions affected: Fylde West;
Lead officer: Rob Hope
removal of Condition 13 of permission reference 05/09/0833 which states: 'No crushing or screening of glass shall be undertaken in the yard area surrounding the building. All screening and crushing operations shall be undertaken within the main building shown on drawing GFR1001.1.100.'
Decision Maker: Development Control Committee
Made at meeting: 14/10/2026 - Development Control Committee
Decision published: 05/11/2026
Effective from: 14/10/2026
Decision:
A report was presented on an application for the retrospective removal of Condition 13 of permission reference 05/09/0833 which stated: 'No crushing or screening of glass shall be undertaken in the yard area surrounding the building. All screening and crushing operations shall be undertaken within the main building shown on drawing GFR1001.1.100'.
The report included the views of Westby-with-Plumptons Parish Council, County Councillor John Singleton, the Environment Agency and Lancashire County Council Highways Development Control. One representation objecting to the application had been received, the details of which were set out in the Committee report.
No comments had been received from Fylde Borough Council or the Lead Local Flood Authority.
An updated Powerpoint presentation had been presented by the Senior Planning Officer under Item 5 on the agenda.
A representation was made by Denise Hollowell, local resident. A summary of the representation is as follows: the representation can be viewed in full at the webcast link here
• The landownership distance from the site is 170m not 250m.
• Wagons entering the site at 5.00am, outside of agreed working hours.
• Site operating outside of agreed opening hours.
• What sort of wheel wash will be provided?
• If a building is demolished, can someone else put a new one in its place?
The officers answered questions from Committee.
Committee expressed concern for the amenity of residents in relation to noise and dust issues, should Condition 13 be removed from the planning permission as this would allow glass processing to take place within the yard area.
It was reported that the Environmental Permit would cover noise, odour, dust, litter, pests, mud on the highway, emissions and other potential amenity impacts.
The Committee were informed that, in relation to concerns around traffic, this was an existing site and that no objections from Lancashire County Council Highways had been received. There was also a condition in place to restrict HGV movements although any complaints received regarding breaches would be investigated.
It was reported that conditions were in place stating that, within three months of any planning permission, both a drainage scheme and details of the containment of stockpiled waste glass should be submitted to and approved in writing by the County Planning Authority.
Although Committee's concerns around the applicant's alleged breaches of planning conditions were recognised, it was noted that the application should only be determined on the planning merits of the application. It was the responsibility of the Environment Agency to decide whether the content of the Environmental Permit needed amending in terms of controlling noise, dust, odour and drainage.
After a discussion, it was Proposed and Seconded:
"That condition 13 be re-included and amended to state that crushing and screening should only take place in the building identified on the application site plan and that washing should only take place in the building or the wash plant area shown on the site plan. The exact condition wording would be agreed by officers, in consultation with the Chair and Deputy of the Committee."
Resolved: That planning permission be granted, subject to:
(i) The conditions set out in Appendix 'A'.
(ii) Condition 13 being re-included and amended to state that crushing and screening should only take place in the building identified on the application site plan and that washing should only take place in the building or the wash plant area shown on the site plan. The exact condition wording would be agreed by officers, in consultation with the Chair and Deputy of the Committee.
Divisions affected: Fylde West;
Lead officer: Rob Hope
Decision Maker: Development Control Committee
Made at meeting: 14/10/2026 - Development Control Committee
Decision published: 05/11/2026
Effective from: 14/10/2026
Decision:
Resolved: That the minutes of the meeting held on 15 July 2026 be confirmed and signed by the Chair.
To seek approval to undertake a public consultation and stakeholder engagement on proposals regarding the future closure of Lancashire County Council's Park and Ride facilities at Walton-le-Dale, Preston, and Caton Road (M6 Junction 34), Lancaster.
The consultation will consider the likely impacts, available alternative travel options and any measures needed to mitigate concerns raised to inform a subsequent Cabinet report containing recommendations and a final decision on the two park and ride sites.
Decision Maker: Cabinet
Decision published: 05/11/2026
Effective from: 11/11/2026
Decision:
The Cabinet approved the recommendation(s) as set out in the report.
Divisions affected: Lancaster Central; Lancaster East; Lancaster Rural East; Lancaster Rural North; Penwortham East & Walton-le-Dale; Preston Central East; Preston Central West; Preston City; Preston East; Preston South East; Preston South West;
Lead officer: Ian Boyd
These proposals
form part of the Levelling Up East Lancashire project. They aim to
deliver improvements in local neighbourhoods through:
• Improving local streets with better connections
through new or improved crossing facilities and
pathways.
• Enhancing streets and public spaces with new planting
and seating.
• Creating safer street environments that makes it
easier for people to walk, cycle or wheel to local
places.
• Improving facilities at local parks and providing new
public green spaces.
• Improving road safety by discouraging pavement parking
at junctions,
• Improving sight lines for people trying to cross the
road and reducing traffic speeds.
The proposals will work together to create a safer
environment for pedestrians, cyclists, and vulnerable users, whilst
also improving public realm in the area. The intention of the
scheme is twofold, to:
• Foster a sense of pride in local communities by
creating safer, greener neighbourhoods and revitalised public
realm.
• Increase active travel uptake to improve health and
wellbeing and reduce health inequalities.
These proposals include the following:
• Minor reduction in the length of the existing bus stop
clearways on Albert Street, restricted to the minimum length
required to accommodate the proposals
Consultations
For Bus Stops - Formal consultation was carried out between
11th September 2026 until 9th October 2026 which included
frontagers to the proposed location of the Bus Stop being notified
and notices being displayed on site. Divisional county councillors
were consulted along with the council's usual
consultees.
Following formal consultation No Objections were
received.
Decision Maker: Director of Highways and Transport
Decision published: 05/11/2026
Effective from: 29/10/2026
Decision:
Peter Bell, Highway Regulation Manager, took a decision to approve the Lancashire County Council (Albert Road, Colne, Pendle Borough) (Removal And Introduction Of Bus Stop Clearways) Legal Reference: LSG4/105843/AFR
Divisions affected: Pendle Central;
Lead officer: Peter Bell
This report seeks approval for the introduction of various parking restrictions on various roads within the Fylde District. Formal consultation has been carried out, during which three objections (including one request for further restrictions) and one request for an amendment were received.
Decision Maker: Cabinet
Decision published: 05/11/2026
Effective from: 11/11/2026
Decision:
The Cabinet approved the recommendation(s) as set out in the report.
Divisions affected: St Annes North;
Lead officer: Clare Duffy, Deborah Nowell, Tracey Price
This report sets out the process of developing a new Lancashire Waste Strategy, the findings of the public consultation and seeks approval to adopt the strategy.
This is deemed to be a Key Decision, and the requirements of the Council's cabinet procedure rules (Standing Order C18, Consideration of Key Decisions) have been complied with.
Decision Maker: Cabinet
Decision published: 05/11/2026
Effective from: 11/11/2026
Decision:
The Cabinet approved the recommendation(s) as set out in the report.
Divisions affected: (All Divisions);
Lead officer: John Birch
To provide a brief update on issues facing the Building Schools for the Future projects and seek Cabinet approval to substitute the authorisation to officers previously approved by Cabinet on 4 September 2025 with the updated authorisation set out in the report.
Decision Maker: Cabinet
Decision published: 05/11/2026
Effective from: 11/11/2026
Decision:
The Cabinet approved the recommendation(s) as set out in the report.
Divisions affected: Brierfield & Nelson West; Burnley Central East; Burnley North East; Burnley South West; Nelson East; Padiham and Burnley West;
Lead officer: Ken Watt
This report presents an application from a local organisation requesting £550 towards a trip to the Netherlands from the Local Member Grants Scheme.
Decision Maker: Local Councillor Decision - Clitheroe
Decision published: 04/11/2026
Effective from: 04/11/2026
Decision:
County Councillor Warren Goldsworthy considered and approved a Local Member Grant of £150 to Girlguiding Lancashire East towards the cost of their trip to the Netherlands.
Divisions affected: Burnley Central West; Burnley Rural; Chorley Rural East; Clitheroe;
Lead officer: Local Member Grants
This report presents an application from an organisation requesting £665 towards Accessibility equipment for their registered blind Councillor from the Champion for Disabled People budget.
Decision Maker: Champion for Disabled People
Decision published: 04/11/2026
Effective from: 04/11/2026
Decision:
County Councillor Gaynor Hargreaves considered and rejected a Champion Grant to Adlington Town Council towards the cost of providing essential accessible equipment and support for Town Councillor Lynne Rennison, who is a registered blind councillor.
Divisions affected: (All Divisions);
Lead officer: Local Member Grants
This report presents an application from a local organisation requesting £1197.60 towards the purchase of a branded Pop Up Gazebo from the Local Member Grants Scheme.
Decision Maker: Local Councillor Decision - Accrington South
Decision published: 23/10/2026
Effective from: 23/10/2026
Decision:
County Councillor Ashley Joynes considered and approved a Local Member Grant of £250 to Veteran Living History Museum towards the cost of purchasing of a branded pop-up gazebo that will support our outreach work throughout the county.
Decision Maker: Local Councillor Decision - Great Harwood, Rishton & Clayton-le-Moors
Decision published: 04/11/2026
Effective from: 23/10/2026
Decision:
County Councillor Jordan Fox considered and approved a Local Member Grant of £250 to Veteran Living History Museum towards the cost of purchasing of a branded pop-up gazebo that will support our outreach work throughout the county.
Divisions affected: Accrington North; Accrington South; Accrington West & Oswaldtwistle Central; Great Harwood, Rishton & Clayton-le-Moors;
Lead officer: Local Member Grants
This report presents an application from a local organisation requesting £1200 towards promotional material from the Local Member Grants Scheme.
Decision Maker: Local Councillor Decision - Clitheroe
Decision published: 04/11/2026
Effective from: 04/11/2026
Decision:
County Councillor Warren Goldsworthy considered and approved a Local Member Grant for the reduced amount of £300 to Ribble Valley Music Festival towards the cost of producing and promoting quality music concerts at the Old School Rooms in Clitheroe to raise money for St Michaels and St Johns Church.
Divisions affected: Clitheroe;
Lead officer: Local Member Grants
This report presents an application from a local organisation requesting £1000.00 towards their food poverty project from the Local Member Grants Scheme
Decision Maker: Local Councillor Decision - Oswaldtwistle
Decision published: 03/11/2026
Effective from: 03/11/2026
Decision:
County Councillor Gaynor Hargreaves considered and approved a Local Member Grant for the reduced amount of £200 to Bahja Initiative towards the cost of supporting a food poverty project which will be used to support a mobile food bank.
The reason for the reduction is that CC Hargreaves only had £200 to spare for her allocated grant funding.
Divisions affected: Accrington West & Oswaldtwistle Central; Oswaldtwistle;
Lead officer: Local Member Grants
This report presents an application from a local organisation requesting £600 towards a 20 week block of weekly, women-only indoor tennis sessions at Brierfield Community Centre from the Local Member Grants Scheme.
Decision Maker: Local Councillor Decision - Brierfield & Nelson West
Decision published: 03/11/2026
Effective from: 03/11/2026
Decision:
County Councillor Mohammed Iqbal MBE considered and rejected a Local Member Grant to The Impact Hub towards the cost of 20-week block of weekly, women-only indoor tennis sessions at Brierfield Community Centre.
The reason for the rejection is that CC Iqbal is reserving funding for other organisations.
Divisions affected: Brierfield & Nelson West;
Lead officer: Local Member Grants
This report presents an application from a local organisation requesting £1500 towards printing for a book from the Local Member Grants Scheme.
Decision Maker: Local Councillor Decision - St Annes South
Decision published: 23/10/2026
Effective from: 23/10/2026
Decision Maker: Local Councillor Decision - St Annes North
Decision published: 02/11/2026
Effective from: 23/10/2026
Decision:
County Councillor Peter Buckley considered and approved a Local Member Grant of £500 to Queen Mary School Association towards printing costs for a book on A History of Queen Mary School and its Community.
County Councillor Peter Buckley declared a non‑pecuniary interest in this application as his wife is a former pupil of Queen Mary School.
Divisions affected: Lytham; St Annes North; St Annes South;
Lead officer: Local Member Grants
This report presents an application from a local organisation requesting £450 towards purchase new equipment and materials for The Little Cobbled Village Community Messy Play Project from the Local Member Grants Scheme.
Decision Maker: Local Councillor Decision - Lancaster Central
Decision published: 02/11/2026
Effective from: 02/11/2026
Decision:
County Councillor Gina Dowding considered and rejected a Local Member Grant to The Little Cobbled Village Community CIC towards the cost of purchasing new equipment and materials for The Little Cobbled Village Community Messy Play Project.
The reason for the rejection is that the date of the event has now passed.
Divisions affected: Lancaster Central;
Lead officer: Local Member Grants
This report sets out updates to the County Council's Constitution since the last meeting of Full Council on 16 July 2026.
Decision Maker: Full Council
Made at meeting: 15/10/2026 - Full Council
Decision published: 30/10/2026
Effective from: 15/10/2026
Decision:
County Councillor Stephen Atkinson moved a report setting out updates which had been made to the County Council's Constitution since the last meeting of Full Council on 16 July 2026 and sought approval for the recommendations of the Political Governance Working Group following its meeting on 9 September 2026.
County Councillor Mohammed Iqbal MBE proposed the following amendment:
Not to accept the recommendations of the Political Governance Working Group as set out at bullet points 1, 2 and 4, and to amend the proposal set out a bullet 5 to read "Amendments to Notices of Motion must be submitted in writing for ease of clarity and voting purposes."
The amendment was seconded by County Councillor Michael Lavalette.
In accordance with Standing Order B45(2) and 45(3) it was moved by County Councillor Stephen Atkinson and seconded by County Councillor Simon Evans that a vote on whether the council should move to a vote take place and in accordance with Standing Order B46(6), a recorded vote was taken. The names of the county councillors who voted for or against and those who abstained are set out below:
For (44)
|
Atkinson, M |
Duxbury |
Jones, A |
More |
Tetlow |
|
Atkinson, S |
Dwyer |
Jones, M |
Parkinson |
Thomson |
|
Austin |
Edwards |
Joynes |
Pickup |
Tomlinson |
|
Balchin |
Evans |
Kniveton |
Poulton |
Topp |
|
Blake |
Fox |
Kutavicius |
Roberts |
Wade |
|
Clemson |
Goldsworthy |
Lord |
Salter |
Walsh |
|
Close |
Gummer |
Matchett |
Schofield |
Whalley |
|
Crimmins |
Hargreaves |
Mirfin |
Shaw |
Worthington |
|
Dalton |
Hutchinson |
Moore |
Sutton |
|
Against (33)
|
Ali |
Clempson |
Howarth |
Motala |
Snape |
|
Asghar |
Clifford |
Iqbal |
Owens |
Snow |
|
Ash |
de Freitas |
Jewell |
Potter |
Stubbins |
|
Ashton |
Dowding |
Johnson |
Razakazi |
Swales |
|
Barnes |
Duke |
Kamran |
Rigby |
Whipp |
|
Brown |
Graham |
Lavalette |
Riggott |
|
|
Buckley |
Hartley |
Mills |
Singleton |
|
Abstain (0)
The request was CARRIED.
The amendment was then put to the vote and in accordance with Standing Order B46(6), a recorded vote was taken. The names of the county councillors who voted for or against the amendment and those who abstained are set out below:
For (32)
|
Ali |
Clifford |
Iqbal |
Owens |
Snow |
|
Asghar |
de Freitas |
Jewell |
Potter |
Stubbins |
|
Ashton |
Dowding |
Johnson |
Razakazi |
Swales |
|
Barnes |
Duke |
Kamran |
Rigby |
Whipp |
|
Brown |
Graham |
Lavalette |
Riggott |
|
|
Buckley |
Hartley |
Mills |
Singleton |
|
|
Clempson |
Howarth |
Motala |
Snape |
|
Against (45)
|
Ash |
Dalton |
Hutchinson |
Moore |
Sutton |
|
Atkinson, M |
Duxbury |
Jones, A |
More |
Tetlow |
|
Atkinson, S |
Dwyer |
Jones, M |
Parkinson |
Thomson |
|
Austin |
Edwards |
Joynes |
Pickup |
Tomlinson |
|
Balchin |
Evans |
Kniveton |
Poulton |
Topp |
|
Blake |
Fox |
Kutavicius |
Roberts |
Wade |
|
Clemson |
Goldsworthy |
Lord |
Salter |
Walsh |
|
Close |
Gummer |
Matchett |
Schofield |
Whalley |
|
Crimmins |
Hargreaves |
Mirfin |
Shaw |
Worthington |
Abstain (0)
The amendment was LOST.
County Councillor Azhar Ali OBE proposed the following amendment:
"To note and refer the recommendations back to the Political Governance Working Group for further consideration and to consider all steps to mitigate any potential legal challenges with a report being brought back to the Annual Meeting in May 2027."
The amendment was seconded by County Councillor Mohammed Iqbal MBE.
On being put to the vote, the amendment was LOST.
Resolved: - That;
(i) The amendments made to the Constitution since the last meeting of Full Council on 16 July 2026, as outlined at Appendix 'A', be noted.
(ii) The recommendations of the Political Governance Working Group as outlined at Appendix 'B', be approved.
Divisions affected: (All Divisions);
Lead officer: Hannah Lysons
The report of the Pension Fund Committee meeting held on 18 September 2026
Decision Maker: Full Council
Made at meeting: 15/10/2026 - Full Council
Decision published: 30/10/2026
Effective from: 15/10/2026
Decision:
County Councillor Joel Tetlow moved the report of the Pension Fund Committee from its meeting on 18 September 2026.
Resolved: - That the report of the Pension Fund Committee, now presented, be noted.
Divisions affected: None;
Lead officer: Mike Neville
Report presenting the scrutiny annual report for 2025-26
Decision Maker: Full Council
Made at meeting: 15/10/2026 - Full Council
Decision published: 30/10/2026
Effective from: 15/10/2026
Decision:
County Councillor Joanne Ash moved a report setting out the Overview and Scrutiny Annual Report for 2025/26.
Resolved: - That the Overview and Scrutiny Annual Report for 2025/26, now presented, be approved.
Divisions affected: (All Divisions);
Lead officer: Samantha Parker
Decision Maker: Full Council
Made at meeting: 15/10/2026 - Full Council
Decision published: 30/10/2026
Effective from: 15/10/2026
Decision:
Notice of Motion 1
It was moved by County Councillor Adrian Owens and seconded by County Councillor Gordon Johnson that:
"This Council notes that:
• Following street works, reinstatements must be notified to Lancashire County Council at the time the reinstatement is completed and state whether the reinstatement is permanent or interim.
• If it is interim, the permanent reinstatement of the street must be made as soon as reasonably practicable and in any event within six months.
• Lancashire County Council should prescribe to the undertaker to reinstate features to assist disabled people and should prescribe the like-for-like replacement of prestige paving and the standards of workmanship required.
• Any undertaker who fails to comply with these provisions commits an offence and is liable to a fine.
This Council believes:
• That Lancashire County Council are currently failing to ensure that undertakers are fulfilling their legal obligations to complete permanent reinstatements within the time period prescribed and to the correct specification and not effectively utilising the power to fine such undertakers.
• That this failure is leaving pedestrianised areas in Lancashire's town centres with a patchwork quilt of black tarmac temporary repairs which are then left unaddressed, sometimes for several years.
• That this failure negatively affects the appearance and economic performance of Lancashire's town centres.
This council therefore resolves:
• To require officers to provide a detailed report to Cabinet within 4 months setting out steps to ensure an effective system and sufficient resources are put in place to ensure undertaker compliance with Section 70 of the New Roads and Street Works Act 1991."
The following amendment was proposed by County Councillor Paul Stubbins:
"This Council notes that:
• Following street works, reinstatements must be notified to Lancashire County Council at the time the reinstatement is completed and state whether the reinstatement is permanent or interim.
• If it is interim, permanent reinstatement must be made as soon as reasonably practicable and in any event within six months.
• Lancashire County Council should prescribe to the undertaker to reinstate features to assist disabled people and should prescribe the like-for-like replacement of prestige paving and the standards of workmanship required.
• Any undertaker who fails to comply with these provisions commits an offence and is liable to a fine.
This Council believes:
• That Lancashire County Council are failing to ensure that undertakers fulfil their legal obligations to complete permanent reinstatements within the prescribed period and specification, and are not effectively utilising powers to fine undertakers.
• Similar concerns arise where County Council works are not reinstated in accordance with like-for-like requirements in conservation, high amenity and primary walking areas.
• That this failure is leaving pedestrianised areas in Lancashire's town centres with a patchwork quilt of tarmac temporary repairs which are then left unaddressed, sometimes for several years.
• That this failure negatively affects the appearance and economic performance of Lancashire's town centres.
This council therefore resolves:
• To require officers to provide a report to Cabinet within 4 months setting out steps and resources required to secure undertaker compliance with Section 70 of the New Roads and Street Works Act 1991.
• The report should also review compliance with the Council's own reinstatement standards."
The amendment was accepted by County Councillor Owens as a friendly amendment in accordance with Standing Order B43 and became the substantive motion as follows:
"This Council notes that:
• Following street works, reinstatements must be notified to Lancashire County Council at the time the reinstatement is completed and state whether the reinstatement is permanent or interim.
• If it is interim, permanent reinstatement must be made as soon as reasonably practicable and in any event within six months.
• Lancashire County Council should prescribe to the undertaker to reinstate features to assist disabled people and should prescribe the like-for-like replacement of prestige paving and the standards of workmanship required.
• Any undertaker who fails to comply with these provisions commits an offence and is liable to a fine.
This Council believes:
• That Lancashire County Council are failing to ensure that undertakers fulfil their legal obligations to complete permanent reinstatements within the prescribed period and specification, and are not effectively utilising powers to fine undertakers.
• Similar concerns arise where County Council works are not reinstated in accordance with like-for-like requirements in conservation, high amenity and primary walking areas.
• That this failure is leaving pedestrianised areas in Lancashire's town centres with a patchwork quilt of tarmac temporary repairs which are then left unaddressed, sometimes for several years.
• That this failure negatively affects the appearance and economic performance of Lancashire's town centres.
This council therefore resolves:
• To require officers to provide a report to Cabinet within 4 months setting out steps and resources required to secure undertaker compliance with Section 70 of the New Roads and Street Works Act 1991.
• The report should also review compliance with the Council's own reinstatement standards."
There being no further amendments, the substantive motion was put to the vote and was LOST.
Notice of Motion 2
It was moved by County Councillor Azhar Ali OBE and seconded by County Councillor Almas Razakazi that:
"This Council believes that no man should face poorer outcomes simply because of his postcode and calls for urgent action at both local and national level to ensure fair access to early diagnosis, innovative treatment and life-saving prostate cancer care.
• Prostate cancer is the most commonly diagnosed cancer in men
• Earlier diagnosis, including the appropriate use of Prostate-Specific Antigen (PSA) testing and timely access to treatment, would significantly improve outcomes and survival
• Access to diagnostic pathways and some specialist treatments, including focal therapies such as High-Intensity Focused Ultrasound (HIFU) and cryotherapy, varies across England
• Men in deprived communities face additional barriers to diagnosis and treatment.
Therefore, this Council resolves to:
1. Call upon Secretary of State for Health & NHS England to develop a national strategy to eliminate regional inequalities in prostate cancer diagnosis and treatment as well as establishing a 'Centre of Excellence' in Lancashire to provide the latest treatment locally.
2. Accelerate access to National Institute for Health and Care Excellence supported focal therapies, including HIFU, for eligible patients.
3. Advocate access to PSA testing and awareness campaigns targeted to those at greater risk of developing prostate cancer.
4. Request that Lancashire's Health & Wellbeing Board review current prostate cancer pathways to improve PSA testing and reduce referral to treatment waiting times.
5. Ask the Director of Public Health to work with partners to increase awareness of prostate cancer symptoms, risk factors and PSA testing, particularly to those over 50."
The following amendment was proposed by County Councillor Shaun Crimmins:
"This Council believes that no man should face poorer outcomes simply because of his postcode and calls for urgent action at both local and national level to ensure fair access to early diagnosis, innovative treatment and life-saving prostate cancer care.
• Prostate cancer is the most commonly diagnosed cancer in men
• Earlier diagnosis, including the appropriate use of Prostate-Specific Antigen (PSA) testing and timely access to treatment, would significantly improve outcomes and survival
• Access to diagnostic pathways and some specialist treatments, including focal therapies such as High-Intensity Focused Ultrasound (HIFU) and cryotherapy, varies across England
• Men in deprived communities face additional barriers to diagnosis and treatment.
Therefore, this Council resolves to:
1. Call upon Secretary of State for Health & NHS England to develop a national strategy to eliminate regional inequalities in prostate cancer diagnosis and treatment as well as establishing a 'Centre of Excellence' in Lancashire to provide the latest treatment locally.
2. Accelerate access to National Institute for Health and Care Excellence supported focal therapies, including HIFU, for eligible patients.
3. Advocate access to PSA testing and awareness campaigns targeted to those at greater risk of developing prostate cancer and those least likely to present for earlier diagnosis.
4. Request that Lancashire's Health & Wellbeing Board review current prostate cancer pathways to improve PSA testing, and reduce referral to treatment waiting times, and reviews access to diagnostic services, including multiparametric MRI and MRI-targeted biopsy services, with a view to reducing postcode inequalities and improving early diagnosis of prostate cancer across Lancashire and South Cumbria.
5. Ask the Director of Public Health to work with partners to increase awareness of prostate cancer symptoms, risk factors and PSA testing, particularly to those over 50."
The amendment was accepted by County Councillor Ali as a friendly amendment in accordance with Standing Order B43 and became the substantive motion as follows:
"This Council believes that no man should face poorer outcomes simply because of his postcode and calls for urgent action at both local and national level to ensure fair access to early diagnosis, innovative treatment and life-saving prostate cancer care.
• Prostate cancer is the most commonly diagnosed cancer in men
• Earlier diagnosis, including the appropriate use of Prostate-Specific Antigen (PSA) testing and timely access to treatment, would significantly improve outcomes and survival
• Access to diagnostic pathways and some specialist treatments, including focal therapies such as High-Intensity Focused Ultrasound (HIFU) and cryotherapy, varies across England
• Men in deprived communities face additional barriers to diagnosis and treatment.
Therefore, this Council resolves to:
1. Call upon Secretary of State for Health & NHS England to develop a national strategy to eliminate regional inequalities in prostate cancer diagnosis and treatment as well as establishing a 'Centre of Excellence' in Lancashire to provide the latest treatment locally.
2. Accelerate access to National Institute for Health and Care Excellence supported focal therapies, including HIFU, for eligible patients.
3. Advocate access to PSA testing and awareness campaigns targeted to those at greater risk of developing prostate cancer and those least likely to present for earlier diagnosis.
4. Request that Lancashire's Health & Wellbeing Board review current prostate cancer pathways to improve PSA testing, and reduce referral to treatment waiting times, and reviews access to diagnostic services, including multiparametric MRI and MRI-targeted biopsy services, with a view to reducing postcode inequalities and improving early diagnosis of prostate cancer across Lancashire and South Cumbria.
5. Ask the Director of Public Health to work with partners to increase awareness of prostate cancer symptoms, risk factors and PSA testing, particularly to those over 50."
There being no further amendments, the substantive motion was put to the vote and was CARRIED.
Resolved: - That:
This Council believes that no man should face poorer outcomes simply because of his postcode and calls for urgent action at both local and national level to ensure fair access to early diagnosis, innovative treatment and life-saving prostate cancer care.
• Prostate cancer is the most commonly diagnosed cancer in men
• Earlier diagnosis, including the appropriate use of Prostate-Specific Antigen (PSA) testing and timely access to treatment, would significantly improve outcomes and survival
• Access to diagnostic pathways and some specialist treatments, including focal therapies such as High-Intensity Focused Ultrasound (HIFU) and cryotherapy, varies across England
• Men in deprived communities face additional barriers to diagnosis and treatment.
Therefore, this Council resolves to:
1. Call upon Secretary of State for Health & NHS England to develop a national strategy to eliminate regional inequalities in prostate cancer diagnosis and treatment as well as establishing a 'Centre of Excellence' in Lancashire to provide the latest treatment locally.
2. Accelerate access to National Institute for Health and Care Excellence supported focal therapies, including HIFU, for eligible patients.
3. Advocate access to PSA testing and awareness campaigns targeted to those at greater risk of developing prostate cancer and those least likely to present for earlier diagnosis.
4. Request that Lancashire's Health & Wellbeing Board review current prostate cancer pathways to improve PSA testing, and reduce referral to treatment waiting times, and reviews access to diagnostic services, including multiparametric MRI and MRI-targeted biopsy services, with a view to reducing postcode inequalities and improving early diagnosis of prostate cancer across Lancashire and South Cumbria.
5. Ask the Director of Public Health to work with partners to increase awareness of prostate cancer symptoms, risk factors and PSA testing, particularly to those over 50.
Notice of Motion 3
It was moved by County Councillor Daniel Matchett and seconded by County Councillor Russell Walsh that:
This council has set aside £16.5m as this council's equitable share of reorganisation costs, within a £30m Implementation Reserve this council holds for Lancashire's fifteen councils.
On 7 September 2026, following judicial reviews including those brought by Reform UK-led councils, the Government paused Lancashire's proposals, with May 2027 elections proceeding on existing boundaries.
This Council believes that:
Residents are entitled to know, in one place, the full cost of preparing for a paused reorganisation. Where central Government directs a reorganisation then pauses it, central Government, not Lancashire council tax payers, should bear the cost. Any revived reorganisation should not proceed without the direct consent of Lancashire's residents.
This Council therefore resolves to:
1. Request that the Cabinet Member for Resources, Property and Efficiency publish within one month a single statement of this council's full reorganisation costs to date, covering the £16.5m and any part drawn down, external advisory costs and officer time, distinguishing money spent from money held, with any plans still assuming abolition.
2. Request the Chief Executive write to the Ministry of Housing, Communities and Local Government seeking full reimbursement of preparation costs stranded by the pause and by extending the delay.
3. Request that this council, as accountable body, uses this period to review every contract relating to LGR and use best endeavours to minimise spending during this pause.
4. Request that, should reorganisation be revived, the Leader ask Government that no change take effect without a binding referendum of Lancashire's electorate."
The following amendment was proposed by County Councillor Mark Clifford and seconded by County Councillor Kim Snape:
To delete the words, "Any revived reorganisation should not proceed without the direct consent of Lancashire's residents" and to delete the fourth resolution, "Request that, should reorganisation be revived, the Leader ask Government that no change take effect without a binding referendum of Lancashire's electorate".
The amendment was put to the vote and was LOST.
There being no further amendments, the substantive motion was then put to the vote and in accordance with Standing Order B46(6), a recorded vote was taken. The names of the county councillors who voted for or against the substantive motion and those who abstained are set out below:
For (57)
|
Ali |
Dowding |
Jones, M |
Owens |
Sutton |
|
Asghar |
Duxbury |
Joynes |
Parkinson |
Tetlow |
|
Atkinson, M |
Dwyer |
Kamran |
Pickup |
Thomson |
|
Atkinson, S |
Edwards |
Kniveton |
Poulton |
Tomlinson |
|
Austin |
Evans |
Kutavicius |
Razakazi |
Topp |
|
Balchin |
Fox |
Lavalette |
Rigby |
Wade |
|
Buckley |
Goldsworthy |
Lord |
Riggott |
Walsh |
|
Clempson |
Graham |
Matchett |
Roberts |
Whalley |
|
Close |
Gummer |
Mills |
Salter |
Worthington |
|
Crimmins |
Hargreaves |
Mirfin |
Schofield |
|
|
Dalton |
Hutchinson |
Moore |
Shaw |
|
|
de Freitas |
Jones, A |
More |
Stubbins |
|
Against (7)
|
Clifford |
Jewell |
Snow |
Whipp |
|
Duke |
Snape |
Swales |
|
Abstain (0)
The substantive motion was CARRIED. It was therefore:
Resolved: - That:
This Council notes that:
This council has set aside £16.5m as this council's equitable share of reorganisation costs, within a £30m Implementation Reserve this council holds for Lancashire's fifteen councils.
On 7 September 2026, following judicial reviews including those brought by Reform UK-led councils, the Government paused Lancashire's proposals, with May 2027 elections proceeding on existing boundaries.
This Council believes that:
Residents are entitled to know, in one place, the full cost of preparing for a paused reorganisation. Where central Government directs a reorganisation then pauses it, central Government, not Lancashire council tax payers, should bear the cost. Any revived reorganisation should not proceed without the direct consent of Lancashire's residents.
This Council therefore resolves to:
1. Request that the Cabinet Member for Resources, Property and Efficiency publish within one month a single statement of this council's full reorganisation costs to date, covering the £16.5m and any part drawn down, external advisory costs and officer time, distinguishing money spent from money held, with any plans still assuming abolition.
2. Request the Chief Executive write to the Ministry of Housing, Communities and Local Government seeking full reimbursement of preparation costs stranded by the pause and by extending the delay.
3. Request that this council, as accountable body, uses this period to review every contract relating to LGR and use best endeavours to minimise spending during this pause.
4. Request that, should reorganisation be revived, the Leader ask Government that no change take effect without a binding referendum of Lancashire's electorate.
Notice of Motion 4
It was moved by County Councillor James Tomlinson and seconded by County Councillor Ged Mirfin that:
"This Council recognises:
Lancashire's farmers, growers and food producers make vital contributions to the county's economy, environment, food security and rural communities.
• Farmers face unprecedented challenges from rising costs, labour shortages, increasing regulation, planning constraints, environmental pressures and market uncertainty.
• Recent changes to Agricultural and Business Property Relief have caused concern throughout the farming community regarding succession planning and the future viability of family farms.
• Lancashire hosts many successful livestock, dairy, poultry, horticultural and arable enterprises vital to the local and national food supply.
• Strong local food networks improve resilience, food security and support rural businesses.
• The contribution of Lancashire's family farms, tenant farmers, dairy, livestock and horticultural businesses.
• Existing efforts to promote local food production, food education and environmental stewardship.
This Council resolves to:
1. Establish a cross-party Lancashire Farming and Rural Prosperity Forum chaired by the Champion for Rural Affairs & the Agricultural Community involving councillors, farming representatives and rural stakeholders.
2. Invite representatives of the National Farmers' Union, the Country Land and Business Association, local agricultural societies and rural businesses to join the Forum and engage with the Council on issues affecting Lancashire farming.
3. Explore opportunities, where legally permissible, operationally practical and financially appropriate to increase the use of Lancashire-produced food within council-supported services.
4. Support initiatives linking farmers with schools, colleges, food partnerships and community organisations.
5. Bring forward proposals from the Forum supporting farming, rural businesses and food security to the Cabinet for consideration."
The following amendment was proposed by County Councillor Gina Dowding and seconded by County Councillor Michael Lavalette:
To add at the end, "6. Write to the Home Secretary asking for a review of legislation to improve the flow of labour from abroad, to address labour shortages in our local farming industry and thereby reduce risks to food security."
The amendment was put to the vote and was LOST.
There being no further amendments, the substantive motion was put to the vote and was CARRIED. It was therefore:
Resolved: - That;
This Council recognises:
Lancashire's farmers, growers and food producers make vital contributions to the county's economy, environment, food security and rural communities.
• Farmers face unprecedented challenges from rising costs, labour shortages, increasing regulation, planning constraints, environmental pressures and market uncertainty.
• Recent changes to Agricultural and Business Property Relief have caused concern throughout the farming community regarding succession planning and the future viability of family farms.
• Lancashire hosts many successful livestock, dairy, poultry, horticultural and arable enterprises vital to the local and national food supply.
• Strong local food networks improve resilience, food security and support rural businesses.
• The contribution of Lancashire's family farms, tenant farmers, dairy, livestock and horticultural businesses.
• Existing efforts to promote local food production, food education and environmental stewardship.
This Council resolves to:
1. Establish a cross-party Lancashire Farming and Rural Prosperity Forum chaired by the Champion for Rural Affairs & the Agricultural Community involving councillors, farming representatives and rural stakeholders.
2. Invite representatives of the National Farmers' Union, the Country Land and Business Association, local agricultural societies and rural businesses to join the Forum and engage with the Council on issues affecting Lancashire farming.
3. Explore opportunities, where legally permissible, operationally practical and financially appropriate to increase the use of Lancashire-produced food within council-supported services.
4. Support initiatives linking farmers with schools, colleges, food partnerships and community organisations.
5. Bring forward proposals from the Forum supporting farming, rural businesses and food security to the Cabinet for consideration.
Notice of Motion 5
County Councillor Tom Lord gave notice to withdraw the Notice of Motion on Election Material Language in accordance with Standing Order B35(1).
Decision Maker: Full Council
Made at meeting: 15/10/2026 - Full Council
Decision published: 30/10/2026
Effective from: 15/10/2026
Decision:
Resolved: - That the minutes from the meeting held on 16 July 2026 and of the Extraordinary General Meeting held on 16 July 2026, be confirmed and signed by the Chairman.
Appendix 'A' sets out a summary report of the Lancashire Combined Fire Authority meeting held on 21 September 2026.
Decision Maker: Full Council
Made at meeting: 15/10/2026 - Full Council
Decision published: 30/10/2026
Effective from: 15/10/2026
Decision:
County Councillor Ged Mirfin moved the report of the Lancashire Combined Fire Authority from its meeting on 21 September 2026.
Resolved: - That the report of the Lancashire Combined Fire Authority, now presented, be noted.
Divisions affected: None;
Lead officer: Gary Halsall
To review the political balance of the County Council following changes to political group membership and to seek approval of revised allocations of committee seats and associated appointments in accordance with the requirements of the Local Government and Housing Act 1989.
Decision Maker: Full Council
Made at meeting: 15/10/2026 - Full Council
Decision published: 30/10/2026
Effective from: 15/10/2026
Decision:
County Councillor Stephen Atkinson moved a report setting out a review of the political balance of the county council following changes to political group membership and to seek approval of revised allocations of committee seats and associated appointments in accordance with the requirements of the Local Government and Housing Act 1989.
Resolved: - That;
(i) The current political composition of the county council, be noted.
(ii) The revised allocation of seats on politically balanced committees, be noted.
(iii) The appointment of county councillors to the politically balanced committees in accordance with nominations submitted by the relevant political groups, be approved.
Divisions affected: (All Divisions);
Lead officer: Andy Milroy
The
Constitution of Lancashire County Council requires Full Council to
receive a
report from the Pension Fund Committee, on the performance
and state of the
Lancashire County Pension Fund and on investment activities
during the preceding
year. This report summarises key elements of the draft
2024/25 Pension Fund Annual
Report (the "Annual Report") approved by the Pension Fund
Committee on 18 September 2026.
Decision Maker: Full Council
Made at meeting: 15/10/2026 - Full Council
Decision published: 30/10/2026
Effective from: 15/10/2026
Decision:
County Councillor Joel Tetlow moved a report setting out an annual report on the performance and state of the Pension Fund and on investment activities during the preceding year.
Resolved: - That the performance and state of the Pension Fund and investment activities for the year ended 31 March 2026 as set out in the report, now presented, be approved.
Divisions affected: N/A;
Lead officer: Junaid Laly
The report of
the Lancashire Combined County Authority from its recent meeting on
8 September 2026 is attached at Appendix 'A'.
The agenda, reports and minutes of the meeting are available
to view on the county council's website. Members can also contact
the officers specified in each report for further information about
each item.
Decision Maker: Full Council
Made at meeting: 15/10/2026 - Full Council
Decision published: 30/10/2026
Effective from: 15/10/2026
Decision:
County Councillor Stephen Atkinson moved the report of the Lancashire Combined County Authority from its meeting on 8 September 2026.
Resolved: - That the report of the Lancashire Combined County Authority, now presented, be noted.
Divisions affected: None;
Lead officer: Craig Alker
The report of
the Employment Committee from its meeting held on 18 August 2026 is
attached at Appendix 'A'.
The agenda, reports and minutes of the meetings are available
to view on the county council's website.
Members can also contact the officers specified in each
report for further information about each item.
Decision Maker: Full Council
Made at meeting: 15/10/2026 - Full Council
Decision published: 30/10/2026
Effective from: 15/10/2026
Decision:
County Councillor Stephen Atkinson moved the report of the Employment Committee from its meeting on 18 August 2026.
Resolved: - That the report of the Employment Committee, now presented, be noted.
Divisions affected: None;
Lead officer: Craig Alker
The report of
the Cabinet from its recent meetings on 3 September 2026 and 1
October 2026 are attached at Appendix 'A'.
The agenda, reports and minutes of the meeting are available
to view on the county council's website. Members can also contact
the officers specified in each report for further information about
each item.
Decision Maker: Full Council
Made at meeting: 15/10/2026 - Full Council
Decision published: 30/10/2026
Effective from: 15/10/2026
Decision:
County Councillor Stephen Atkinson moved the report of the Cabinet from its meetings on 3 September 2026 and 1 October 2026.
Resolved: - That the report of the Cabinet, now presented, be noted.
Divisions affected: (All Divisions);
Lead officer: Craig Alker
The most recent
cycle of meetings of the Overview and Scrutiny Committees since the
last Full Council meeting took place. A report of the committees as
follows is attached at Appendix 'A':
Budget and Finance (29 June 2026 and 2 September
2026)
Children, Families and Skills (14 May 2026 and 16
September)
Community, Cultural and Corporate Services (11 September 2026
and 24 September 2026)
Environment, Economic Growth and Transport (17 September
2026)
Health and Adult Services (23 September 2026)
Decision Maker: Full Council
Made at meeting: 15/10/2026 - Full Council
Decision published: 30/10/2026
Effective from: 15/10/2026
Decision:
County Councillor Joanne Ash moved the report of the Overview and Scrutiny Committees from their meetings as follows:
- Budget and Finance (29 June 2026 and 2 September 2026)
- Children, Families and Skills (14 May 2026 and 16 September 2026)
- Community, Cultural and Corporate Services (11 September 2026 and 24 September 2026)
- Environment, Economic Growth and Transport (17 September 2026)
- Health and Adult Services (23 September 2026)
Resolved: - That the report of the Overview and Scrutiny Committees, now presented, be noted.
Divisions affected: (All Divisions);
Lead officer: Marianne Sherman
The existing Library Byelaws have been amended to reflect current service delivery and ensure a safe, comfortable environment for all library users.
Decision Maker: Full Council
Made at meeting: 15/10/2026 - Full Council
Decision published: 30/10/2026
Effective from: 15/10/2026
Decision:
County Councillor Ella Worthington moved a report proposing a revised set of Library Byelaws that had been updated to reflect national and local changes.
Resolved: - That;
(i) The draft Library Byelaws set out at Appendix 'A' for the purposes of commencing the statutory procedure for confirmation under section 19 of the Public Libraries and Museums Act 1964 and section 236 of the Local Government Act 1972, be approved.
(ii) The Director of Communities and Engagement, in consultation with the Director of Law and Governance, be authorised to take all necessary steps to comply with the statutory procedure for obtaining confirmation of the byelaws, including publication of notices, making documents available for inspection and submission of the application for confirmation to the Secretary of State.
(iii) The Director of Law and Governance be authorised to approve any minor or consequential amendments required by the Department for Culture, Media and Sport or arising from the confirmation process, provided that such amendments do not materially alter the effect of the byelaws.
(iv) Upon confirmation of the byelaws by the Secretary of State, the Director of Law and Governance be authorised to affix the Common Seal of the County Council and bring the byelaws into operation in accordance with the confirmation.
Divisions affected: (All Divisions);
Lead officer: Georgina Roby
This report presents the recommendation of the Audit, Risk and Governance Committee from its meeting held on 27 July 2026, seeking approval that the 2026/27 prudential indicator to be achieved relating to the profile of borrowing is amended. The committee report is included.
Decision Maker: Full Council
Made at meeting: 15/10/2026 - Full Council
Decision published: 30/10/2026
Effective from: 15/10/2026
Decision:
County Councillor Ged Mirfin moved a report presenting the recommendation of the Audit, Risk and Governance Committee from its meeting held on 27 July 2026, regarding the 2026/27 prudential indicator relating to the council's profile of borrowing.
Resolved: - That the 2026/27 prudential indicator to be achieved relating to the profile of borrowing be amended as set out in Appendix 'A' and Annexes 1 - 4, be approved.
Divisions affected: N/A;
Lead officer: Lauren Lewthwaite
The report of the Audit, Risk and Governance Committee from its meeting held on 27 July 2026 is attached at Appendix 'A'.
Decision Maker: Full Council
Made at meeting: 15/10/2026 - Full Council
Decision published: 30/10/2026
Effective from: 15/10/2026
Decision:
County Councillor Ged Mirfin moved the report of the Audit, Risk and Governance Committee from its meeting on 27 July 2026.
Resolved: - That the report of the Audit, Risk and Governance Committee, now presented, be noted.
Divisions affected: None;
Lead officer: Lauren Lewthwaite
This report sets out a draft timetable of Full Council, Cabinet and Committee meetings for the period 1 June 2027 to 31 March 2028.
Decision Maker: Full Council
Made at meeting: 15/10/2026 - Full Council
Decision published: 30/10/2026
Effective from: 15/10/2026
Decision:
County Councillor Stephen Atkinson moved a report setting out a draft timetable of Full Council, Cabinet and Committee meetings for the period 1 June 2027 to 31 May 2028.
Resolved: - That the timetable of
Full Council, Cabinet and Committee meetings for the period 1 June
2027 to 31 May 2028 inclusive, as set out at
Appendix 'A', now presented, be approved.
Divisions affected: (All Divisions);
Lead officer: Craig Alker
The committee
has considered periodic reports of progress throughout the year
that support this overall report and the conclusion that moderate
assurance can be provided over the county council's systems of
internal control and governance. This report summarises the work
that the Internal Audit Service has undertaken during August and
September 2026 and the key themes arising in relation to internal
control, governance and risk management across the county
council.
Decision Maker: Audit, Risk and Governance Committee
Made at meeting: 12/10/2026 - Audit, Risk and Governance Committee
Decision published: 30/10/2026
Effective from: 12/10/2026
Decision:
Andrew Dalecki, Head of Internal Audit, presented the Internal Audit Progress Report.
It was noted that the report provided an overall positive position. No limited assurance opinions had been issued during the quarter, with findings relating primarily to continuous improvement rather than significant weaknesses. Eleven audit assignments had been completed and 19 were in progress, meaning approximately half of the annual audit plan had either been completed or commenced.
In response to questions, members were informed that:
• Further information would be provided to members on the corporate register of key strategies and policies, including their issue status and review dates, after the meeting.
• The Highways Asset Management System audit would be finalised and presented to the Committee in November. Five other audits had progressed from draft to final since the report had been prepared.
• An update would be provided to members on the Department for Education’s 18-point Skills Bootcamp improvement plan after the meeting. No similar weaknesses had been identified in other grant-funded programmes.
• The superseded procurement recommendation had been replaced by an updated audit process. The emerging procurement strategy would bring together the Contract Procedure Rules, Social Value Policy, Lancashire Supplier Charter, contract management arrangements and procurement pipeline.
• The 2027/28 audit plan was expected to be more significantly affected by Local Government Reorganisation than the 2026/27 plan, while schools audit work was scheduled to begin during the third quarter.
• The full Organisational Ethics audit report would be circulated to members after the meeting.
Resolved: That the Internal Audit Progress Report be noted.
Divisions affected: (All Divisions);
Lead officer: Mark Baskerville, Andrew Dalecki
This report provides an updated Corporate Risk and Opportunity Register for the committee to consider and comment on. The register has been refreshed to reflect the council's current operating environment and is presented to this committee to provide a progress update and assurance that the current risk management arrangements are both robust and effective.
Decision Maker: Audit, Risk and Governance Committee
Made at meeting: 12/10/2026 - Audit, Risk and Governance Committee
Decision published: 30/10/2026
Effective from: 12/10/2026
Decision:
Hannah Race, Head of Governance and Democratic Services, presented the updated Corporate Risk and Opportunity Register.
It was noted that no new risks had been added and most scores remained unchanged. The risk relating to national policy had been removed from the corporate register following a sustained reduction in its score, although it would continue to be managed at directorate level. Members' comments regarding unregistered children's homes and SEND school-place sufficiency would be considered as part of the next quarterly review.
In response to questions, members were informed that:
• The council’s priorities would be considered as part of the development of the procurement strategy.
•
Local Government Reorganisation would place additional
demands on organisational capacity. The extended timetable provided
both benefits and challenges, and it was recognised that the
council would need to balance business-as-usual activity with
preparations for reorganisation. Members commented on the potential
impact on recruitment, retention and organisational
capacity.
•
Forecast implementation costs across the 15 councils were
approximately £30m. Around £1.2m had been incurred to
date, of which the county council’s share was approximately
£750,000. Representations had been made to the Government
regarding reimbursement.
•
All 12 recommendations arising from the Southport Public
Inquiry had been completed, with further governance and partnership
actions continuing. The council was not a core participant in the
second part of the inquiry.
•
Training on the council's risk management arrangements,
including scoring, would be arranged for members and formed part of
the Local Government Association Corporate Peer Challenge action
plan.
Resolved: That:
i) The Corporate Risk and Opportunity Register be approved; and
ii) A risk deep-dive report on the impact of Local Government Reorganisation on recruitment, retention and organisational capacity be provided at a future meeting, to include senior roles and relevant information from exit interviews.
Divisions affected: N/A;
Lead officer: Hannah Race
The following pages are the Appendix 'C' to Item 8 – Corporate Risk and Opportunity Register – Quarterly Update.
Decision Maker: Audit, Risk and Governance Committee
Made at meeting: 12/10/2026 - Audit, Risk and Governance Committee
Decision published: 30/10/2026
Effective from: 12/10/2026
Divisions affected: N/A;
Lead officer: Lauren Lewthwaite
Lancashire
County Council has a legal obligation to publish complaints and
customer feedback reports on social care statutory complaints on an
annual basis. There are two statutory procedures, both different:
one for children and young people's social care complaints and one
for adult social care complaints. Additionally, a Corporate Report
on complaints and feedback for other council services will also
require formal approval. All three reports will report on
statistics and trends, acknowledging the associated learning, so
that the county council can meet its legal obligations and publish
information on our website.
Decision Maker: Audit, Risk and Governance Committee
Made at meeting: 12/10/2026 - Audit, Risk and Governance Committee
Decision published: 30/10/2026
Effective from: 12/10/2026
Decision:
Angela Esslinger, Complaints and Appeals Manager, and County Councillor Simon Evans, Deputy Leader and Cabinet Member for Children and Families, presented the Annual Reports on Complaints and Feedback 2025 to 2026.
It was noted that timeliness and communication remained the principal areas for improvement. Although the overall number of complaints had increased, the number upheld by the Local Government and Social Care Ombudsman had reduced. SEND continued to be a significant area of concern and further work was required to improve outcomes.
In response to questions, members were informed that:
• Additional posts had been established to improve the handling of SEND complaints. Performance was monitored through key performance indicators and the officer Compliance and Assurance Board, and further arrangements would be considered to ensure senior managers were informed of delayed responses.
•
School-place sufficiency was included within the Corporate
Risk and Opportunity Register and the SEND Reform Action Plan
identified the need for additional special-school places and
specialist provision within mainstream schools.
•
Two judicial review applications, relating to SEND and
procedural matters, had been made but neither had been taken
forward by the court. Further information would be provided to
members on relevant pre-action correspondence, lessons learned and
mitigating actions after the meeting.
•
Financial remedies exceeding £100,000 had been paid in
relation to SEND maladministration. Other complaint-related costs
included the statutory use of independent investigators for
children’s social care complaints and the waiving of charges
where errors had occurred.
•
The council’s complaints procedures had been refreshed,
with an emphasis on early intervention, direct communication and
resolving concerns before they escalated.
•
Additional staffing had been required to address the backlog
of Education, Health and Care Plan assessments. Staffing levels and
progress against the SEND Reform Action Plan would continue to be
reviewed.
• A new complaints and feedback system was being developed to improve performance reporting, data capture and post-closure feedback. Consideration would also be given to capturing verbal compliments.
Resolved: That the Annual Reports on Complaints and Feedback 2025 to 2026 be noted.
Divisions affected: (All Divisions);
Lead officer: Angela Esslinger
The following pages are the Appendix 'C' to Item X – Internal Audit Progress Report.
Decision Maker: Audit, Risk and Governance Committee
Made at meeting: 12/10/2026 - Audit, Risk and Governance Committee
Decision published: 30/10/2026
Effective from: 12/10/2026
Divisions affected: (All Divisions);
Lead officer: Lauren Lewthwaite
Decision Maker: Audit, Risk and Governance Committee
Made at meeting: 12/10/2026 - Audit, Risk and Governance Committee
Decision published: 30/10/2026
Effective from: 12/10/2026
Decision:
Kelly Jarvis, Grant Thornton UK, presented the External Audit Progress Report and Sector Update.
It was noted that the audit of the 2025/26 financial statements had commenced in accordance with the planned timetable. Substantive testing was well underway, samples had been issued and evidence had been received for almost all items.
In response to questions, members were informed that further information would be provided confirming whether the council used unregistered children's care homes, after the meeting.
Resolved: That the External Audit Progress Report and Sector Update be noted.
Decision Maker: Audit, Risk and Governance Committee
Made at meeting: 12/10/2026 - Audit, Risk and Governance Committee
Decision published: 30/10/2026
Effective from: 12/10/2026
Decision:
Kelly Jarvis, Grant Thornton UK, presented the Lancashire County Pension Fund Interim External Audit Findings Report for 2025/26.
It was noted that the audit was substantially complete and that, subject to completion of the remaining work, the external auditor anticipated issuing an unmodified audit opinion. The final report would be presented alongside the council's (as Administrating Authority) Audit Findings Report at the November Committee meeting.
In response to questions, members were informed that:
• The additional £10,000 fee related to work on the triennial valuation, including testing a further 75 items, and was subject to approval by Public Sector Audit Appointments Ltd.
•
Information from the Additional Voluntary Contributions
provider had not been available when the report was prepared due to
timing.
•
The outstanding information relating to eight Level 3
investments had since been received.
•
The additional audit fee of £4,250 had resulted from
delays in receiving the complete general ledger and audit samples.
A written breakdown would be provided to members after the
meeting.
• Training material would be made available for members on the Local Audit and Accountability Act 2014 after the meeting.
Resolved: That the Lancashire County Pension Fund Interim External Audit Findings Report be noted.
Decision Maker: Audit, Risk and Governance Committee
Made at meeting: 12/10/2026 - Audit, Risk and Governance Committee
Decision published: 30/10/2026
Effective from: 12/10/2026
Decision:
Resolved: That the press and members of the public be excluded from the meeting during consideration of the following items of business on the grounds that there would be a likely disclosure of exempt information, as defined in the appropriate paragraph of Part 1 of Schedule 12A to the Local Government Act 1972.
It was considered that in all the circumstances, the public interest in maintaining the exemption outweighed the public interest in disclosing the information.
A review of the
LCC Regulation of Investigatory Powers Policy to ensure it complies
with the current legislation and codes of practice and a summary of
the activity undertaken by LCC that requires approval.
The Audit, Risk and Governance Committee is asked to approve
the corporate policies on:
(i) RIPA Surveillance
(ii) Non-RIPA surveillance
(iii) The use of social media and the Internet in
investigations
Decision Maker: Audit, Risk and Governance Committee
Made at meeting: 12/10/2026 - Audit, Risk and Governance Committee
Decision published: 30/10/2026
Effective from: 12/10/2026
Divisions affected: (All Divisions);
Lead officer: Helene Corlett
This report presents an application from a local organisation requesting £600 towards promotional material from the Local Member Grants Scheme.
Decision Maker: Local Councillor Decision - Longridge With Bowland
Decision published: 30/10/2026
Effective from: 30/10/2026
Decision:
County Councillor Ian Duxbury considered and approved a Local Member Grant of £600 to Ribble Valley Music Festival towards the cost of promotional material.
Divisions affected: Longridge with Bowland;
Lead officer: Local Member Grants
Tarleton Bank Hall Bridge, A59, has been subject to several bridge strikes. Works are proposed to improve the surface and signage
Decision Maker: Director of Highways and Transport
Decision published: 28/10/2026
Effective from: 19/10/2026
Decision:
Kirstie Williams, Head of Transport Services and Strategic Partnerships has taken a decision to approve the Tarleton Bank Hall Bridge surface treatments.
Divisions affected: Chorley Rural West; West Lancashire West;
Lead officer: Kirstie Williams
This report presents an application from a local organisation requesting £2000 towards theatre and band hire, trees and lights from the Local Member Grants Scheme.
Decision Maker: Local Councillor Decision - Cleveleys East
Decision published: 28/10/2026
Effective from: 28/10/2026
Decision:
County Councillor James Crawford considered and approved a Local Member Grant of £666.67 to Thornton-Cleveleys Gala Committee towards the cost of Thornton-Cleveleys Gala Winter Concert.
Divisions affected: Cleveleys East; Cleveleys South & Carleton; Thornton & Hambleton;
Lead officer: Local Member Grants
A decision on the approval to award contracts for condition surveys.
Decision Maker: Director of Highways and Transport
Decision published: 28/10/2026
Effective from: 26/10/2026
Decision:
John Davies, Interim Director of Highways and Transport has taken a decision as set out in the report.
Divisions affected: N/A;
Lead officer: John Davies
A decision on the School Budgeting System.
Decision Maker: Corporate Director of Finance
Decision published: 28/10/2026
Effective from: 23/10/2026
Decision:
Khadija Saeed, Head of Corporate Finance has taken a decision as set out in the report.
Divisions affected: None;
Lead officer: Khadija Saeed
A decision on
the Minor Aids and Adaptations Service Contract Award.
Decision Maker: Executive Director of Adults, Health and Wellbeing
Decision published: 28/10/2026
Effective from: 18/09/2026
Decision:
Antony Bell-Thorn, Head of Commissioning Strategy & Partnerships has taken a decision as set out in the report.
Divisions affected: Accrington North; Accrington South; Accrington West & Oswaldtwistle Central; Brierfield & Nelson West; Burscough & Rufford; Clitheroe; Fylde East; Fylde South; Fylde West; Great Harwood, Rishton & Clayton-le-Moors; Longridge with Bowland; Nelson East; Ormskirk; Oswaldtwistle; Pendle Central; Pendle Hill; Pendle Rural; Preston Central East; Preston Central West; Preston City; Preston East; Preston North; Preston Rural; Preston South East; Preston South West; Preston West; Ribble Valley North East; Ribble Valley South West; Skelmersdale Central; Skelmersdale East; Skelmersdale West; St Annes North; St Annes South; West Lancashire East; West Lancashire North; West Lancashire West;
Lead officer: Antony Bell-Thorn
At the Highways and Transportation Committee in September 1992 the policy set out below was approved for the removal of graffiti from County Council highway structures. It is proposed to update it to reflect current structures and corporate approach to public realm and civic pride
Decision Maker: Director of Highways and Transport
Decision published: 28/10/2026
Effective from: 19/10/2026
Decision:
Kirstie Williams, Head of Transport Services and Strategic Partnerships has taken a decision to approve the update to Removal of Graffiti from Highway Structures policy.
Divisions affected: (All Divisions);
Lead officer: Kirstie Williams
Decision to award We Are With You additional funding over a three year period between 2026 and 2029
Decision Maker: Executive Director of Adults, Health and Wellbeing
Decision published: 28/10/2026
Effective from: 25/08/2026
Decision:
Helen Coombes, Executive Director of Adults, Health & Wellbeing has taken a decision to approve Drug & Alcohol Treatment & Recovery - Additional Funding.
Divisions affected: (All Divisions);
Lead officer: Helen Coombes
Approval is
sought for Lancashire County Council to allocate £8,000
funding received from BDW Trading Limited under the Highway Network
Contribution secured through the Section 106 Agreement associated
with planning application 07/2017/3361/ORM.
The funding will be used to deliver a signing and lining
scheme on Longmeanygate to improve the visibility of the approved
development access and to raise awareness of the nearby private
residential access at Longmeanygate. The proposal responds to
complaints from residents that drivers seeking to access the
development are mistakenly entering the private residential
access.
The proposed scheme accords with the purposes of the Section
106 contribution, specifically Point 4, which seeks to support
wider signing and gateway measures on routes in and around the
development.
Authority to take this decision has been delegated to the
Head of Service – Highways Network Management.
That the Director of Law and Governance is authorised to
allocate and spend £8,000 of the Section 106 Highway Network
Contribution funding to deliver a signing and lining scheme on
Longmeanygate to improve the visibility of the approved development
access and inform drivers of the presence of the nearby private
residential access..
Decision Maker: Director of Highways and Transport
Decision published: 28/10/2026
Effective from: 23/10/2026
Decision:
John Davies, Interim Director of Highways and Transport, has taken a decision to approve the Section 106 Agreement associated with planning application (07/2017/3361/ORM), Longmeanygate.
Divisions affected: Moss Side & Farington;
Lead officer: John Davies
Approval to Award the Children's Residential-Specific Case Management System contract to Yerado Ltd T/A Lief
Decision Maker: Director of Children's Social Care
Decision published: 28/10/2026
Effective from: 22/10/2026
Decision:
Jennifer Robertshaw, Head of Service, Children in our Care and Care Leavers, has taken a decision as set out in the report.
Divisions affected: (All Divisions);
Lead officer: Jennifer Robertshaw
This report presents an application from a local organisation requesting £500 towards Sleigh generator fuel, Printing/publicity material and Sleigh repairs/new equipment from the Local Member Grants Scheme.
Decision Maker: Local Councillor Decision - Fylde East
Decision published: 28/10/2026
Effective from: 28/10/2026
Decision:
County Councillor Joshua Roberts considered and approved a Local Member Grant of £500 to Kirkham and Rural Fylde 41 Club towards the cost of Generator fuel and publicity material and new/replacement equipment as necessary to continue safely conducting our Santa's Sleigh Collections around the Fylde.
Divisions affected: Fylde East;
Lead officer: Local Member Grants
This report presents an application from an organisation requesting £4,200 towards cost to deliver the history workshop from the Champion for Young People budget.
Decision Maker: Head of Service Democratic Services
Decision published: 27/10/2026
Effective from: 27/10/2026
Decision:
The Head of Democratic Services, following consultation with
County Councillor Mackenzie Ritson, Champion for Young People,
rejected a Champions Grant application to Accrington Heritage
Trust.
The reason for the rejection was due to the date passing with
the application.
Divisions affected: (All Divisions);
Lead officer: Janet Nuttall
This report presents an application from a local organisation requesting £500 towards Christmas lights from an external company from the Local Member Grants Scheme.
Decision Maker: Local Councillor Decision - Morecambe North
Decision published: 27/10/2026
Effective from: 27/10/2026
Decision:
County Councillor Russell Walsh considered and approved a Local Member Grant for the reduced amount of £250 to Bare Community Association towards the cost of Christmas lights from an external company.
The reason for the reduction is that CC Walsh is reserving funding for additional organisations operating within my division.
Divisions affected: Morecambe North;
Lead officer: Local Member Grants
This report presents an application from an organisation requesting £500 towards the running costs of their activity FEAR/LESS from the Champion for Young People budget.
Decision Maker: Head of Service Democratic Services
Decision published: 27/10/2026
Effective from: 27/10/2026
Decision:
The Head of Democratic Services, following consultation with
County Councillor Mackenzie Ritson, Champion for Young People,
rejected a Champions Grant application to VISION
(Rossendale)
The reason for the rejection was due to the date passing with
the application
Divisions affected: (All Divisions);
Lead officer: Janet Nuttall
To update the Lancashire Local Pension Board on the risks related to the Lancashire County Pension Fund. A full review of the risk register is required this quarter and the key risks to be considered in detail are highlighted below.
Decision Maker: Lancashire Local Pension Board
Made at meeting: 20/10/2026 - Lancashire Local Pension Board
Decision published: 26/10/2026
Effective from: 20/10/2026
Decision:
Mr Almond, Senior Governance Officer Pensions, presented a report on the various risks associated with the Lancashire County Pension Fund and highlighted two key risks regarding cyber resilience and information security, and Local Government Reorganisation (LGR).
The Board discussed the implications of Artificial Intelligence (AI) and how that should be reflected in the Risk Register and Mr Almond reported that the assessment of service providers by the pensions Team in the New Year would help to inform the Fund position and approach to AI.
It was reported that the government had paused LGR following the submission of judicial reviews and in order to make sure that the project aligned with separate plans to devolve powers to local authorities. Whilst no further announcement had been made by the government local authorities would continue to work together and across the wider public sector in anticipation of a decision for Lancashire.
The Chair referred to a recommendation from a previous external audit of LPPA regarding improvement of identity verification processes in line with industry best practice, and it was suggested that a report be brought to the next meeting.
Resolved:
i) That the updates in relation to key risks O7 (Cyber resilience and information security) and T8 (Local Government Reorganisation) and 'Other Risks of Note', as set out in the report presented, are noted.
ii) That a report be presented to the next meeting of the Board on the response of LPPA to the external auditor's recommendation to improve identity verification processes in line with industry best practice.
Divisions affected: N/A;
Lead officer: James Almond
To update the Local Pension Board on training involving members of the Board which has taken place since the meeting in July 2026
Decision Maker: Lancashire Local Pension Board
Made at meeting: 20/10/2026 - Lancashire Local Pension Board
Decision published: 26/10/2026
Effective from: 20/10/2026
Decision:
Mr Almond, Senior Governance Officer Pensions, presented a report on training activity since the last meeting and updated the Board on the LGPS Online Learning Academy modules which had been completed by the Chair, Ms Parker and Mr Lawrence since the agenda had been circulated and that the training record would be updated accordingly. Mr Davies also informed the Board that he had completed Modules 1 and 2. It was further reported that since the last meeting Ms Parker had attended three webinars and that a technical workshop would be held on 4 November followed by one on governance on 2 December 2026.
Mr Almond also confirmed that Board members would be asked to participate in the Hymans Annual Knowledge Assessment during November/December 2026 which would help to identify any knowledge gaps and inform future training.
Resolved: That the report and updates given at the meeting regarding pension related training activity involving Board members is noted.
Divisions affected: N/A;
Lead officer: James Almond
Decision Maker: Lancashire Local Pension Board
Made at meeting: 20/10/2026 - Lancashire Local Pension Board
Decision published: 26/10/2026
Effective from: 20/10/2026
Decision:
The Chair welcomed everyone to the meeting and noted that Mr S Dunstan, Employer representative (Other) Ms D Parker, Scheme Member representative, and Ms M George, Independent Person, had joined the meeting remotely. No apologies were presented.
Decision Maker: Lancashire Local Pension Board
Made at meeting: 20/10/2026 - Lancashire Local Pension Board
Decision published: 26/10/2026
Effective from: 20/10/2026
Decision:
The Chair declared a non-pecuniary interest as a Non-Executive Director of the Wales Pension Partnership Investment Management Company and a deferred member of the Local Government Pension Scheme. She also informed the Board of her intention to establish a none profit company looking at training and governance standards across the LGPS for independent advisers and other professionals.
Decision Maker: Lancashire Local Pension Board
Made at meeting: 20/10/2026 - Lancashire Local Pension Board
Decision published: 26/10/2026
Effective from: 20/10/2026
Decision:
Resolved: That, the Minutes of the meeting held on 15 July 2026 are confirmed as an accurate record and signed by the Chair.
Decision Maker: Lancashire Local Pension Board
Made at meeting: 20/10/2026 - Lancashire Local Pension Board
Decision published: 26/10/2026
Effective from: 20/10/2026
Decision:
It was noted that the next scheduled meeting of the Board would be held at 2.00pm on 26 January 2027 in Committee Room 'B' - The Diamond Jubilee Room at County Hall, Preston.
This report
provides an update on various regulatory issues and industry news
to assist the Local Pension Board members in their
role.
Decision Maker: Lancashire Local Pension Board
Made at meeting: 20/10/2026 - Lancashire Local Pension Board
Decision published: 26/10/2026
Effective from: 20/10/2026
Decision:
Ms Hunt, Technical & Administration Pension Lead, presented a report on various pension related issues, including scheme improvements on access and fairness, the consultation on access/protections, and conditions for transfers, and answered questions from Board members.
Resolved: That the updates on pension-related regulatory matters set out in the report presented and discussed at the meeting are noted.
Divisions affected: N/A;
Lead officer: Catherine Hunt
Decision Maker: Lancashire Local Pension Board
Made at meeting: 20/10/2026 - Lancashire Local Pension Board
Decision published: 26/10/2026
Effective from: 20/10/2026
Decision:
Resolved: That the press and public be excluded from the meeting during consideration of the following item of business on the grounds that there would be a likely disclosure of exempt information as defined in the appropriate paragraph of Part 1 of Schedule 12A to the Local Government Act, 1972, as indicated against the heading of each item. It is considered that in all the circumstances the public interest in maintaining the exemption outweighs the public interest in disclosing the information.
This report
presents a draft Conflicts of Interest Policy for the Lancashire
County
Pension Fund (the Fund). The policy sets out how actual,
potential and perceived
conflicts of interest are identified, monitored and managed
effectively as is required
under regulations.
Decision Maker: Lancashire Local Pension Board
Made at meeting: 20/10/2026 - Lancashire Local Pension Board
Decision published: 26/10/2026
Effective from: 20/10/2026
Decision:
Ms Brown, Pensions Governance Lead, presented a report on the revised Conflict of Interest Policy which had been approved by the Pension Fund Committee on the 18 September 2026, subject to any substantive changes which the Pension Board may recommend.
In considering the report the Board noted two minor amendments to the Policy regarding a requirement for individuals to disclose any membership of special interest groups, and clarification that being a member of the LGPS did not constitute a conflict for councillors/officers. In response to a query the Chair suggested that the Policy should also reflect that members of the Pension Board who were also members of the LGPS were not conflicted.
Resolved:
i) That the Introduction of the Conflict of Interests Policy for the Lancashire County Pension Fund be amended to reflect that members of the Pension Board who are also members of the LGPS are not conflicted.
ii) That subject to the minor amendment specified at i) above the Conflict of Interests Policy for the Fund, as approved by the Pension Fund Committee on 18 September 2026 and set out at Appendix 'A' to the report presented, is noted.
Divisions affected: N/A;
Lead officer: Jayne Brown
This report references administration matters, including performance, service level agreement (SLA) metrics, and project updates.
Decision Maker: Lancashire Local Pension Board
Made at meeting: 20/10/2026 - Lancashire Local Pension Board
Decision published: 26/10/2026
Effective from: 20/10/2026
Decision:
Mr C Batts. Head of Client Services from Local Pensions Partnership Administration Ltd (LPPA) presented a report on pension administration performance during Quarter 1, highlighting various key points including:
• Casework performance - 98.9% of cases meeting the applicable service levels against a target of 95%. Early retirement notifications improved, with just under 60% received on time during the quarter. In cases where notification was timely and no additional voluntary contribution was involved, almost 80% of pensions were paid within 30 days, representing a further improvement on the previous quarter.
• The average contact-centre waiting time exceeded the four-minute target during quarter 1 though performance had improved during July - September to around two minutes or less. Contact-centre satisfaction was consistent with the previous quarter.
• The annual pensions increase was applied to 99.7% of eligible pensioners and 99.9% of deferred members. Outstanding cases will continue to be reviewed and resolved.
• 85 of the initial 688 overseas pensioners included in the life-certificate exercise had been verified at the time of reporting with further returned certificates and tracing results to be processed and progress monitored through monthly reporting.
• Regarding annual benefit statements completion rates were 96.3% for active members and 99% for deferred members with similar levels achieved for statements containing McCloud underpin information.
• Divorce and transfer cases that had been paused in accordance with national advice were now progressing, with the intention of clearing the outstanding cases by the end of the calendar year.
Board members questioned an LPPA internal target of paying 50% of pensions within 30 days where notification had been received on time and no additional voluntary contribution was involved. As the target was not considered an appropriate level of ambition once factors outside the administrator’s control had been excluded it was suggested that LPPAs Executive Leadership Team review the position.
The Board also noted that a small percentage of annual benefit statements containing McCloud remedy information had not been issued by the statutory deadline and the Fund had concluded that the shortfall did not amount to a material breach. Consequently, the Pensions Regulator had been notified of the position, rather than being sent a formal breach report. The Chair confirmed that the Fund’s notification, together with the Board’s acknowledgement of the position, as recorded in the Minutes, was sufficient and that individual Board members were not required to submit separate notifications.
Resolved:
i) That
the report and updates from the Head of Client Services of
Local
Pensions Partnership Administration Ltd given at the meeting
are noted.
ii) That
the Board consider LPPAs internal target of paying 50%
of
pensions within 30 days where notification had been received
on time and no additional voluntary contribution was involved to be
too low and ask the Executive Leadership Team to review
it.
Divisions affected: N/A;
Lead officer: Catherine Hunt
An update for the Pension Board on the Part I reports considered at the most recent Pension Fund Committee and decisions taken.
Decision Maker: Lancashire Local Pension Board
Made at meeting: 20/10/2026 - Lancashire Local Pension Board
Decision published: 26/10/2026
Effective from: 20/10/2026
Decision:
Mr Neville, Senior Democratic Services Officer, presented a report on the items of business considered by the Pension Fund Committee on 18 September 2026 some of which were covered in detail by individual reports elsewhere on the Board agenda.
Resolved: That the reports considered by the Pension Fund Committee on 18 September 2026 are noted.
Divisions affected: None;
Lead officer: Mike Neville
It is a requirement of the Fund to have an Independent Governance Review (IGR) completed by 31 March 2028. The Fund will be procuring a reviewer with an intention to undertake the review early in 2027/28.
Decision Maker: Lancashire Local Pension Board
Made at meeting: 20/10/2026 - Lancashire Local Pension Board
Decision published: 26/10/2026
Effective from: 20/10/2026
Decision:
The Head of Fund presented a report on the new regulatory requirement for LGPS Funds to be independently reviewed in relation to governance, management, and oversight by 31 March 2028, to provide assurance that they operate effectively, comply with regulations and act in the best interest of scheme members/employers.
The Board was informed that on 18 September 2026 the Pension Fund Committee had agreed that the governance review would take place in the first half of the 2027/28 financial year and an update on the procurement of an appropriate assessor via the national framework to undertake the review would be presented to the Committee in March 2027. A further report on the outcome of the review and draft action plan in response to any recommendations would then be presented later that year.
Resolved: That the arrangements for the independent review of the Lancashire County Pension Fund as approved by the Pension Fund Committee on 18 September 2026 are noted.
Divisions affected: (All Divisions);
Lead officer: Peter George
Decision Maker: Lancashire Local Pension Board
Made at meeting: 20/10/2026 - Lancashire Local Pension Board
Decision published: 26/10/2026
Effective from: 20/10/2026
Decision:
(Exempt information as defined in Paragraph 3 of Part 1 of Schedule 12A to the Local Government Act 1972. It was considered that in all the circumstances of the case the public interest in maintaining the exemption outweighed the public interest in disclosing the information).
Ms K Hill, Head of Risk and Governance from Local Pensions Partnership Administration Ltd presented a report on the independent AAF audit of LPPA internal controls across a range of operational activities including pension administration processing, transfer calculations and benefit payments, service level monitoring, access management, and supporting IT controls. It was noted that LPPA had received an unqualified reasonable assurance opinion from the auditor and would continue to review opportunities to strengthen controls and improve the evidence captured, enhance automation and further mature assurance and risk management arrangements.
Resolved:
i) That the findings of the independent assurance report on Local Pensions Partnership Administration Ltd internal controls are noted.
ii) That Local Pensions Partnership Administration Ltd be asked to:
a. develop a wider assurance framework to show how ISO accreditation, compliance, and internal audits will provide assurance on activities that are not covered by the AAF Type 2 Assessment.
b. work with the Head of Fund to develop a policy requiring scheme members to be notified after 30 days of the reasons why complaints have not been resolved and provided with a timetable for further updates.
c. clarify how the resolution of outstanding bereavement cases submitted before 1 July 2026 will be prioritised.
This report is
to update Local Pension Board members on risk management
and
governance issues relating to the Lancashire County Pension
Fund (the Fund) since
the meeting in July 2026
Decision Maker: Lancashire Local Pension Board
Made at meeting: 20/10/2026 - Lancashire Local Pension Board
Decision published: 26/10/2026
Effective from: 20/10/2026
Decision:
Ms Brown, Pensions Governance Lead, presented a report on various governance matters relating to the Fund, some of which were the subject of individual reports elsewhere on the agenda, and confirmed that updates on the training strategy and risk framework review would be brought to the next meeting.
The Head of Fund informed the Board that the Fund was in a strong position regarding compliance with many of the new LGPS governance requirements. In response to a query he confirmed that the Investment Panel comprised of Ms George, the Independent Person, Mr Crum, the Independent Investment Adviser, and himself (as Chair), supported by Officers and representatives from LPPI. It was noted that the Chair and Deputy Chair of the Pension Fund Committee were also invited to attend the Panel if they were available.
Resolved: That the update set out in the report regarding training, oversight and governance of the Lancashire County Pension Fund is noted.
Divisions affected: N/A;
Lead officer: Jayne Brown
This report outlines the governance associated with the development of the Fund's draft Investment Strategy Statement ("ISS") and seeks the Board's comments on the ISS as part of a broader consultation phase on the draft statement.
Decision Maker: Lancashire Local Pension Board
Made at meeting: 20/10/2026 - Lancashire Local Pension Board
Decision published: 26/10/2026
Effective from: 20/10/2026
Decision:
The Head of Fund presented a report on the updated Investment Strategy Statement (ISS) which had been developed in consultation with members of the Pension Fund Committee the Investment Panel and LPPI and was currently out for consultation with key stakeholders, including the Pension Board.
In considering the report the Board discussed the governance processes used to review and develop the ISS before discussing three key questions from the consultation regarding stability/affordability, increasing local investment, and acceptance of potential lower return or higher risk for local investment where there may be associated social or economic benefits.
The Head of Fund asked Board members to submit any additional comments regarding the draft Investment Strategy Statement to him for consideration as part of the consultation.
Resolved: That the Pension Board:
i) note the governance processes used to develop the draft Investment Strategy Statement, approved by the Pension Fund Committee on 18 September 2026 and set out at Appendix 'A' to the report presented.
ii) agree
the following responses in relation to the key questions in the
Investment Strategy Statement consultation with
stakeholders:
a) that
balancing long term employer contribution stability and
affordability is an appropriate approach.
b) that
Local investment in Lancashire should be increased to
a
target of 3% of the Fund's portfolio, equivalent to
approximately £400m.
c) That
where a local investment is considered to deliver an
enhanced level of social and economic benefits to Lancashire
the Fund may accept a lower level of investment return or accept a
higher-level risk for such projects.
Divisions affected: (All Divisions);
Lead officer: Peter George
A decision on the approval to award a contract for supply of asphalt for Various December Schemes.
Decision Maker: Director of Highways and Transport
Decision published: 26/10/2026
Effective from: 26/10/2026
Decision:
Enda Garvey, Interim Head of Highway Operations and Design has taken a decision as set out in the report.
Divisions affected: Burnley Rural; Lancaster East; Lancaster Rural East; Lancaster South East; Longridge with Bowland; Pendle Hill; Skerton; Wyre Rural East;
Lead officer: Enda Garvey
This report presents an application from an organisation requesting £1,034 towards their rewards trip to London from the Champion for Young People budget.
Decision Maker: Champion for Young People
Decision published: 26/10/2026
Effective from: 26/10/2026
Decision:
County Councillor Mackenzie Ritson considered and rejected a Champion Grant to Amazing Accrington towards the cost of train tickets.
The reason for the rejection is that the date of the project has now passed.
Divisions affected: (All Divisions);
Lead officer: Janet Nuttall
Please move
£2,224.06 to 17549 from 17322
Please move £10,072.47 to 17549 from 17229
Please move £19,497.25 to 17549 from 17251
Please move £5,664.33 to 17549 from 17268
Please move £6,547.73 to 17549 from 17256
Please move £8,366.69 to 17549 from 17270
Please move £18,119.91 to 17549 from 17321
Please move £2,283.52 to 17549 from 16889
Please move £7,032.97 to 17549 from 16896
Please move £2,513.55 to 17549 from 16897
Please move £27,532.78 to 17549 from 17247
Please move £9,210.60 to 17549 from 17489
Please move £2,719.76 to 17549 from 17255
Please move £25,247.97 to 17549 from 17257
Please move £9,802.96 to 17549 from 17259
Please move £11,240.78 to 17549 from 17260
Please move £9,441.02 to 17549 from 17261
Please move £1,373.68 to 17549 from 16902
Please move £14,944.53 to 17549 from 17014
Please move £838.27 to 16898 from 17549
Please move £331.13 to 16900 from 17549
Please move £290.16 to 16903 from 17549
Please move £800.00 to 16904 from 17549
Please move £500.00 to 17008 from 17549
Please move £2,871.56 to 17020 from 17549
Please move £1,950.43 to 17230 from 17549
Please move £1,732.32 to 17239 from 17549
Please move £1,069.97 to 17249 from 17549
Please move £2,083.54 to 17515 from 17549
Please move £2,310.43 to 17519 from 17549
Please move £11,165.37 to 17563 from 17549
Please move £73.45 to 17238 from 17538
Please move £596.22 to 17239 from 17538
Please move £596.22 to 17239 from 17539
Decision Maker: Director of Highways and Transport
Decision published: 26/10/2026
Effective from: 22/10/2026
Decision:
Enda Garvey, Interim Head of Highway Operations and Design has taken a decision to approve the Transfer of Remaining Capital Drainage Funds from Completed Schemes to the Unallocated Budget.
Divisions affected: (All Divisions);
Lead officer: Enda Garvey
Correction of
monies to balance the Tour de France surface treatment
schemes.
Monies from PPMS Id 17290 to -
17301 = £28,955.16
17287 = £6,750.62
Decision Maker: Director of Highways and Transport
Decision published: 26/10/2026
Effective from: 08/09/2026
Decision:
Enda Garvey, Interim Head of Highways and Operations has taken a decision to approve the transfer of budgets on surface treatment costs.
Divisions affected: (All Divisions);
Lead officer: Enda Garvey
A decision on the approval to issue a Mini-competition for supply of asphalt for Various December Schemes
Decision Maker: Director of Highways and Transport
Decision published: 26/10/2026
Effective from: 21/10/2026
Decision:
Enda Garvey, Interim Head of Highways and Operations has taken a decision as set out in the report.
Divisions affected: Burnley Rural; Lancaster East; Lancaster Rural East; Lancaster South East; Longridge with Bowland; Pendle Hill; Skerton; Wyre Rural East;
Lead officer: Enda Garvey
Head of Service
is asked to approve the reallocation of residual funds from a
completed project at Calder Vale and Grindleton to an ongoing
project in the Trough of Bowland.
Request details:
1. Transfer £42,000 from completed project ID 17035
26/27 Calder Vale Road - Barnacre-with-Bonds - Adjacent to 1-2
Victoria Terrace to in progress project: ID 17034 26/27 Sykes Farm
Retaining Wall 32995 and Blaze Moss Culvert.
2. Transfer £16,500 from completed project ID 17032
26/27 Grindleton Bridge 1072 to in progress project: ID 17034 26/27
Sykes Farm Retaining Wall 32995 and Blaze Moss
Culvert.
The reallocation is between projects in the same programme
and there is no change to the total approved budget.
The changes are required because additional work is required
to complete essential works at Sykes Farm and Blaze Moss and this
project now requires additional funds.
This item does not require cabinet approval.
Christopher Wilding
Bridges and Geotechnical Design Manager
20th October 2026
Decision Maker: Director of Highways and Transport
Decision published: 26/10/2026
Effective from: 20/10/2026
Decision:
Enda Garvey, Interim Head of Highways and Operations has taken a decision to approve Changes to the Bridges Maintenance Capital programme October 2026.
Divisions affected: Longridge with Bowland;
Lead officer: Enda Garvey
Retaining Wall Code of Practice sits under the Highway Maintenance Plan and was last updated in 2020, it is proposed to update to reflect current operating practices
Decision Maker: Director of Highways and Transport
Decision published: 26/10/2026
Effective from: 19/10/2026
Decision:
Kirstie Williams, Head of Transport Services and Strategic Partnerships has taken a decision to approve the Update to Retaining Wall code of practice.
Divisions affected: (All Divisions);
Lead officer: Kirstie Williams
A decision on the approval to award a contract for supply of asphalt to Derby Street West, L39 3NH.
Decision Maker: Director of Highways and Transport
Decision published: 26/10/2026
Effective from: 20/10/2026
Decision:
Enda Garvey, Interim Head of Highways and Operations has taken a decision as set out in the report.
Divisions affected: Ormskirk;
Lead officer: Enda Garvey
A decision on the approval to award a contract for supply of asphalt to Chain Lane, FY4 4XB.
Decision Maker: Director of Highways and Transport
Decision published: 26/10/2026
Effective from: 19/10/2026
Decision:
Enda Garvey, Interim Head of Highway Operations and Design has taken a decision as set out in the report.
Divisions affected: Fylde West;
Lead officer: Enda Garvey
A decision on the approval to award a contract for AC10 Asphalt Material for Various November Schemes.
Decision Maker: Director of Highways and Transport
Decision published: 26/10/2026
Effective from: 20/10/2026
Decision:
Enda Garvey, Interim Head of Highways and Operations has taken a decision as set out in the report.
Divisions affected: Burnley Central East; Fleetwood West & Cleveleys West; Lancaster Rural North; Morecambe North; Morecambe South; Ormskirk; Pendle Rural; Ribble Valley North East; Skelmersdale East; Skerton; West Lancashire West; Wyre Rural East;
Lead officer: Enda Garvey
This report presents an application from an organisation requesting £2,495 towards new instruments for their women's drumming programmes from the Champion for Mental Health budget.
Decision Maker: Head of Service Democratic Services
Decision published: 23/10/2026
Effective from: 23/10/2026
Decision:
The Head of Democratic Services, following consultation with
County Councillor Jordan Fox, Champion for Mental Health, rejected
a Champions Grant application to Pendle Rhythm.
The reason for the rejection was due to the date passing with
the application
Divisions affected: (All Divisions);
Lead officer: Janet Nuttall
This report presents an application from an organisation requesting £390 towards a day trip to Cleveleys from the Champion for Disabled People budget
Decision Maker: Head of Service Democratic Services
Decision published: 23/10/2026
Effective from: 23/10/2026
Decision:
The Head of Democratic Services, following consultation with
County Councillor Gaynor Hargreaves, Champion for Disabled People,
rejected a Champions Grant application to Stronger Together Carers
towards the cost of a fish and chip tea to Cleveleys.
The reason for the rejection was due to the date passing with
the application
Divisions affected: (All Divisions);
Lead officer: Janet Nuttall
This report presents an application from a local organisation requesting £1980 towards contribution towards equipment, refreshments and venue hire from the Local Member Grants Scheme.
Decision Maker: Local Councillor Decision - Burnley North East
Decision published: 23/10/2026
Effective from: 23/10/2026
Decision:
County Councillor Usman Arif considered and rejected a Local Member Grant to Carefit in the Community CIC towards the cost of their Creative Connections with Forever Felts project.
The reason for the rejection is that the date of the project has now passed.
Divisions affected: Brierfield & Nelson West; Burnley North East; Burnley Rural;
Lead officer: Local Member Grants
This report presents an application from a local organisation requesting £2000 towards firewood, refreshments, craft materials from the Local Member Grants Scheme.
Decision Maker: Local Councillor Decision - Burnley Central West
Decision published: 23/10/2026
Effective from: 23/10/2026
Decision:
County Councillor Liam Thomson considered and rejected a Local Member Grant to Outdoors 4 All Together towards the cost of Campfire & Conversation” programme.
The reason for the rejection is that the date of the project has now passed.
Divisions affected: Burnley Central West; Ribble Valley South West;
Lead officer: Local Member Grants
To approve the outcome of the procurement process for the provision of a Learner Feedback Tool and award a contract to Qualtrics.
Decision Maker: Lancashire Combined County Authority - Chief Operating Officer
Decision published: 23/10/2026
Effective from: 21/10/2026
Decision:
Matthew Sidgreaves, Chief Operating Officer, in consultation with the Chair of the Skills Advisory Board, the Section 73 Officer and the Monitoring Officer, approved the recommendations, as set out in the report.
Lead officer: Ashley Wells
This report presents an application from an organisation requesting £600.00 towards their 2026 Christmas Party from the Champion for Disabled People budget.
Decision Maker: Champion for Disabled People
Decision published: 22/10/2026
Effective from: 22/10/2026
Decision:
The Head of Democratic Services, following consultation with County Councillor Gaynor Hargreaves, Champion for Disabled People, approved a Champions Grant application of £600 to Visually impaired children’s support towards the cost of their 2026 Christmas Party.
Divisions affected: (All Divisions);
Lead officer: Champion Grants
This report presents an application from an organisation requesting £577 towards the Farm Trip at Christmas from the Champion for Disabled People budget.
Decision Maker: Champion for Disabled People
Decision published: 22/10/2026
Effective from: 22/10/2026
Decision:
The (Acting) Head of Democratic Services, following consultation with County Councillor Gaynor Hargreaves, Champion for Disabled People, approved a Champions Grant application of £577.00 to 1st Oswaldtwistle Girl's Brigade towards the cost of their trip to the Christmas Farm.
Divisions affected: (All Divisions);
Lead officer: Janet Nuttall
This report presents an application from a local organisation requesting £2000 towards venue hire and transport costs from the Local Member Grants Scheme.
Decision Maker: Local Councillor Decision - Burnley Central East
Decision published: 22/10/2026
Effective from: 22/10/2026
Decision:
County Councillor Maheen Kamran considered and rejected a Local Member Grant to Blackburn Blind Sports towards the cost of venue hire and taxis for blind people.
The reason for the rejection is that the date of the project has now passed.
Decision Maker: Local Councillor Decision - Burnley North East
Decision published: 22/10/2026
Effective from: 22/10/2026
Decision:
County Councillor Usman Arif considered and rejected a Local Member Grant to Blackburn Blind Sports towards the cost of venue hire and taxis for blind people.
The reason for the rejection is that the date of the project has now passed.
Decision Maker: Local Councillor Decision - Accrington West & Oswaldtwistle Central
Decision published: 22/10/2026
Effective from: 22/10/2026
Decision:
County Councillor Sohail Asghar considered and rejected a Local Member Grant to Blackburn Blind Sports towards the cost of venue hire and taxis for blind people.
The reason for the rejection is that the date of the project has now passed.
Decision Maker: Local Councillor Decision - Mid Rossendale
Decision published: 22/10/2026
Effective from: 22/10/2026
Decision:
County Councillor Clive Balchin considered and rejected a Local Member Grant to Blackburn Blind Sports towards the cost of venue hire and taxis for blind people.
The reason for the rejection is that the date of the project has now passed.
Divisions affected: Accrington North; Accrington South; Accrington West & Oswaldtwistle Central; Brierfield & Nelson West; Burnley Central East; Burnley North East; Mid Rossendale; Nelson East; Oswaldtwistle; Preston Central East; Preston City; Preston Rural; Preston South East; Preston South West; Ribble Valley South West; Rossendale East; Rossendale South; Rossendale West; West Lancashire North; West Lancashire West;
Lead officer: Local Member Grants
A decision on the NoWcard Concessionary Travel System (Managed Service).
Decision Maker: Executive Director of Place
Decision published: 21/10/2026
Effective from: 14/10/2026
Decision:
Phil Green, Executive Director of Place, has taken a decision as set out in the report.
Divisions affected: None;
Lead officer: Phil Green
This report presents an application from a local organisation requesting £750 towards coach hire for a performance from the Local Member Grants Scheme.
Decision Maker: Local Councillor Decision - Fylde South
Decision published: 21/10/2026
Effective from: 21/10/2026
Decision:
County Councillor David Dwyer considered and approved a Local Member Grant of £750 to Freckleton Music Festival towards the cost of coach hire.
Divisions affected: Fylde South;
Lead officer: Local Member Grants
Decision Maker: Pension Shareholder Governance Committee
Made at meeting: 12/10/2026 - Pension Shareholder Governance Committee
Decision published: 20/10/2026
Effective from: 12/10/2026
Decision:
It was noted that in accordance with the decision taken under item 5 on the agenda the next meeting would be held at 2.00pm on 13 January 2027 followed by a meeting at 10.00am on 30 March 2027, both to be held in the Palatine Room at County Hall, Preston.
Decision Maker: Pension Shareholder Governance Committee
Made at meeting: 12/10/2026 - Pension Shareholder Governance Committee
Decision published: 20/10/2026
Effective from: 12/10/2026
Decision:
Resolved: That, subject to a minor amendment, the Minutes of the meeting held on 30 July 2026 are confirmed as an accurate record and signed by the Chair.
Decision Maker: Pension Shareholder Governance Committee
Made at meeting: 12/10/2026 - Pension Shareholder Governance Committee
Decision published: 20/10/2026
Effective from: 12/10/2026
Decision:
As a decision had been deferred at the previous meeting the Chair asked for nominations for the position of Deputy Chair and it was MOVED and SECONDED that County Councillor J Tetlow be appointed as Deputy Chair of the Committee. No other nominations were received and on being put to the vote the Motion was agreed and it was therefore:
Resolved: That County Councillor J Tetlow is appointed as the Deputy Chair of the Pension Shareholder Governance Committee.
Decision Maker: Pension Shareholder Governance Committee
Made at meeting: 12/10/2026 - Pension Shareholder Governance Committee
Decision published: 20/10/2026
Effective from: 12/10/2026
Decision:
No items of business were raised under this heading.
This report seeks approval of dates for meetings in January/April2027, sets out proposed dates for 2027/28 and presents a Work Plan.
Decision Maker: Pension Shareholder Governance Committee
Made at meeting: 12/10/2026 - Pension Shareholder Governance Committee
Decision published: 20/10/2026
Effective from: 12/10/2026
Decision:
Mr Neville, Senior Democratic Services Officer, presented his report on two potential dates for meetings in early 2027 together with the proposed 2027/28 programme of meetings and a draft Work Plan for the Committee.
The Committee noted the 13 January 2027 had been identified as a suitable date for the next meeting and, after some discussion, agreed the 30 March 2027 as the date for the subsequent meeting, thereby completing the 2026/27 programme of quarterly meetings.
The proposed 2027/28 programme of meetings (which would be presented to Full Council on the 15 October 2026) was also discussed and Mr Neville confirmed that if the dates were approved arrangements for the Committee meetings would be finalised and all Committee members informed. The Head of Fund added that as final dates for future Board meetings of LPPL and LPPIHL had not yet been confirmed it may be necessary to amend some of the dates for Committee in order to align with the Board dates.
Mr Neville also presented a draft Work Plan which allocated specific items of business to future Committee meetings based on the expected timing of those items in the Terms of Reference that required shareholder decisions, though it was noted additional items of business could be added to the Work Plan as and when required. The Head of Fund confirmed that an additional report was planned for the next meeting in relation to the Lancashire County Pension Fund Conflict of Interest Policy which would apply to Committee members.
Resolved: That the Committee:
i) approve
the arrangements for the next two meetings to be held in
the
Palatine Room at County Hall, Preston, starting at 2.00pm on
13 January 2027 and 10.00am on 30 March 2027.
ii) note
the proposed 2027/28 programme of meetings for the
Committee
which will be presented to Full Council on 15 October 2026
for approval.
iii) approve
the initial Work Plan for future meetings of the Committee,
as
set out at Appendix 'A' to the report presented.
Divisions affected: None;
Lead officer: Mike Neville
This report provides an update on matters arising within LPPA and LPPI for the attention of the Pension Shareholder Governance Committee
Decision Maker: Pension Shareholder Governance Committee
Made at meeting: 12/10/2026 - Pension Shareholder Governance Committee
Decision published: 20/10/2026
Effective from: 12/10/2026
Decision:
The Head of Fund presented a report on various matters considered by the Local Pensions Partnership Ltd (LPPL) Board on 15 September 2026 and Local Pensions Partnership Investments Holdings Ltd (LPPIHL) Board on 30 September 2026 and answered questions from Committee members.
Resolved: That the updates on matters discussed at the LPPL and LPPIHL Boards in September 2026, as set out in the report presented, are noted.
Divisions affected: (All Divisions);
Lead officer: Peter George
This report presents an application from an organisation requesting £500 towards the cost of their activity weekend from the Champion for Rural Affairs, the Agricultural Community & Parishes budget
Decision Maker: Head of Service Democratic Services
Decision published: 20/10/2026
Effective from: 20/10/2026
Decision:
The Head of Democratic Services, following consultation with
County Councillor James Tomlinson, Champion for Rural Affairs, the
Agricultural Community & Parishes, rejected a Champions Grant
application to Whitworth Town Council towards the cost of
organising a free weekend event (both Saturday and Sunday) for the
Whitworth community.
The reason for the rejection was due to the event date
passing.
Divisions affected: (All Divisions);
Lead officer: Janet Nuttall
This report presents an application from a local organisation requesting £1940.82 towards Upsilon Pro Modular Conference and Boardroom Tables and Operator Chairs from the Local Member Grants Scheme.
Decision Maker: Local Councillor Decision - Burnley Central West
Decision published: 20/10/2026
Effective from: 20/10/2026
Decision:
County Councillor Liam Thomson considered and approved a Local Member Grant of £1,940.82 to Casual Minds Matter CIC towards the cost of purchasing of furniture for the new ‘Dedicated to Ricky Hatton’ mental health meeting room at Casual Minds Matter CIC.
Divisions affected: Burnley Central West;
Lead officer: Local Member Grants
This report presents an application from an organisation requesting £500 towards Purchase of 4,000 bulbs from Boston seeds from the Champion for Rural Affairs, the Agricultural Community & Parishes budget.
Decision Maker: Champion for Rural Affairs, the Agricultural Community & Parishes
Decision published: 20/10/2026
Effective from: 20/10/2026
Decision:
The Head of Democratic Services, following consultation with County Councillor James Tomlinson, Champion for Rural Affairs, the Agricultural Community & Parishes, approved a Champions Grant application of £500 to Up Holland Parish Council towards the cost of Purchase of 4,000 bulbs from Boston seeds.
Divisions affected: (All Divisions);
Lead officer: Champion Grants
Approval to
award a contract for Nelson Resurfacing of Carriageways
and
Associated Works.
Decision Maker: Director of Highways and Transport
Decision published: 20/10/2026
Effective from: 14/10/2026
Decision:
John Davies, Interim Director of Highways and Transport has taken a decision as set out in the report.
Divisions affected: Nelson East;
Lead officer: John Davies
This report presents an application from an organisation requesting £450.00 towards the Christmas party for local older residents from the Champion for Older People budget.
Decision Maker: Champion for Older People
Decision published: 20/10/2026
Effective from: 20/10/2026
Decision:
The (Acting) Head of Democratic Services, following
consultation with County Councillor Janet Schofield, Champion for
Older People, rejected a Champions Grant application to Larches and
Savick Community Association towards the cost of the Christmas
party for local older residents
The reason for the rejection was due to a lack of
funding.
Divisions affected: (All Divisions);
Lead officer: Champion Grants
This report presents an application from an organisation requesting £823.58 towards clinical training items that will enable ward staff to safely manage PICC lines, ports and cannulas from the Champion for Older People budget
Decision Maker: Champion for Older People
Decision published: 20/10/2026
Effective from: 20/10/2026
Decision:
The (Acting) Head of Democratic Services, following consultation with County Councillor Janet Schofield, Champion for Older People, approved a Champions Grant application for the reduced amount of £192 to St John's Hospice towards the cost of clinical training items that will enable ward staff to safely manage PICC lines, ports and cannulas.
Divisions affected: (All Divisions);
Lead officer: Champion Grants
A decision on the approval to issue extension to contract for the Volunteer Family Support Service.
Decision Maker: Director of Policy, Commissioning and Children's Health
Decision published: 20/10/2026
Effective from: 12/10/2026
Decision:
Annette McNeil, Head of Service has taken a decision as set out in the report.
Divisions affected: (All Divisions);
Lead officer: Annette McNeil
Blackpool Rd Preston footway micro scheme has had several changes with the measure, extents on the pre patching and removal of vegetation/siding back. Monies to be moved from PPMS ID – 16285 to 17384 for £25,236.45.
Decision Maker: Director of Highways and Transport
Decision published: 19/10/2026
Effective from: 25/08/2026
Decision:
Enda Garvey, Interim Head of Highways Operations and Design has taken a decision to approve the transfer of budgets on surface treatment costs.
Divisions affected: (All Divisions);
Lead officer: Enda Garvey
This report presents an application from a local organisation requesting £2000 towards bus hire and costumes for a dance competition from the Local Member Grants Scheme.
Decision Maker: Local Councillor Decision - Preston West
Decision published: 19/10/2026
Effective from: 19/10/2026
Decision:
County Councillor John Potter considered and rejected a Local Member Grant to Crusaders Morris Dancers Preston towards the cost of funding travel to a competition.
The reason for the rejection is that the date of the event has now passed.
Divisions affected: Preston North; Preston South East; Preston South West; Preston West;
Lead officer: Local Member Grants
Approval to commence procurement for Suicide Recording System
Decision Maker: Director of Public Health, Wellbeing and Communities
Decision published: 19/10/2026
Effective from: 15/10/2026
Decision:
Dr Sakthi Karanunithi, Director of Public Health, Wellbeing and Communities has taken a decision as set out in the report.
Divisions affected: (All Divisions);
Lead officer: Dr Sakthi Karunanithi
This report presents an application from a local organisation requesting £1877.50 towards delivering a 30 week non-contact boxing and wellbeing programme in Colne, for local and neighbouring residents from the Local Member Grants Scheme.
Decision Maker: Local Councillor Decision - Pendle Central
Decision published: 19/10/2026
Effective from: 19/10/2026
Decision:
County Councillor Marion Atkinson considered and rejected a Local Member Grant to BOOST Wellbeing CIC towards the cost of delivering a 30 week non-contact boxing and wellbeing programme in Colne, for local and neighbouring residents.
The reason for the rejection is that the date of the project has now passed.
Divisions affected: Pendle Central;
Lead officer: Local Member Grants
This report presents an application from an organisation requesting £1,000 towards their Christmas Tree Lighting from the Champion for Rural Affairs, the Agricultural Community and Parishes budget.
Decision Maker: Champion for Rural Affairs, the Agricultural Community & Parishes
Decision published: 16/10/2026
Effective from: 16/10/2026
Decision:
The Head of Democratic Services, following consultation with County Councillor James Tomlinson, Champion for Rural Affairs, the Agricultural Community & Parishes, approved a Champions Grant application for the reduced amount of £800 to Hoghton Parish Council towards the cost of resources for their 2026 Christmas evening.
Divisions affected: (All Divisions);
Lead officer: Janet Nuttall
This report presents an application from a local organisation requesting £2000 towards activities for people with learning difficulties from the Local Member Grants Scheme.
Decision Maker: Local Councillor Decision - Ormskirk
Decision published: 16/10/2026
Effective from: 16/10/2026
Decision:
County Councillor Gordon Johnson considered and rejected a Local Member Grant to Sporting Challenge towards the cost of pool and ten pin bowling nights.
The reason for the rejection is that the councillor had no funding left.
Divisions affected: Burscough & Rufford; Ormskirk; Skelmersdale Central; Skelmersdale East; Skelmersdale West; West Lancashire East; West Lancashire North; West Lancashire West;
Lead officer: Local Member Grants
This report presents an application from an organisation requesting £350 towards reintroducing a local pantomime for the benefit of the whole community, with performances taking place over two weekends in late January 2027from the Champion for Rural Affairs, the Agricultural Community & Parishes budget.
Decision Maker: Head of Service Democratic Services
Decision published: 16/10/2026
Effective from: 16/10/2026
Decision:
The Head of Democratic Services, following consultation with County Councillor James Tomlinson, Champion for Rural Affairs, the Agricultural Community & Parishes, approved a Champions Grant application of £350 to PCC of Longton St Andrew towards the cost of Childrens pantomine supplies.
Divisions affected: (All Divisions);
Lead officer: Champion Grants
This report presents an application from a local organisation requesting £2,000.00 towards Camping equipment and some subside to lower income families from the Local Member Grants Scheme.
Decision Maker: Local Councillor Decision - Ormskirk
Decision published: 16/10/2026
Effective from: 16/10/2026
Decision:
County Councillor Gordon Johnson considered and approved a Local Member Grant for the reduced amount of £114 to 37th Ormskirk Scout Group towards the cost of camping equipment – cookers and tents.
The reason for the reduction is that CC Johnson had multiple applications and wanted to give as much money to as many organisations as possible.
Divisions affected: Burscough & Rufford; Ormskirk; West Lancashire East; West Lancashire West;
Lead officer: Local Member Grants
This report presents an application from a local organisation requesting £2000 towards training and uniforms for the street pastors from the Local Member Grants Scheme.
Decision Maker: Local Councillor Decision - Ormskirk
Decision published: 16/10/2026
Effective from: 16/10/2026
Decision:
County Councillor Gordon Johnson considered and approved a Local Member Grant for the reduced amount of £100 to Ormskirk Street Pastors towards the cost of presentations and workshops on 'Knife Crime' and 'Social Media' in St Bede's School.
The reason for the reduction is that CC Johnson had multiple applications with limited funds and wanted to give as much money to as many organisations as possible.
Divisions affected: Burscough & Rufford; Ormskirk; Skelmersdale Central; Skelmersdale East; Skelmersdale West; West Lancashire East; West Lancashire North; West Lancashire West;
Lead officer: Local Member Grants
This report presents an application from a local organisation requesting £800.00 towards the purchase of Trophies, Craft Materials, Toys and Furniture for Dolls Houses from the Local Member Grants Scheme.
Decision Maker: Local Councillor Decision - Euxton, Buckshaw & Astley
Decision published: 16/10/2026
Effective from: 16/10/2026
Decision:
County Councillor Aidy Riggott considered and approved a Local Member Grant for the reduced amount of £750 to Friends Of Euxton Library towards the cost of purchasing of Trophys, Crafts, STEM Inter-Active, Toys and Furniture for Doll's House.
The reason for the reduction is that this the remaining allocation of CC Riggott's grant funding.
Divisions affected: Euxton, Buckshaw & Astley;
Lead officer: Local Member Grants
This report presents an application from a local organisation requesting £2000 towards staff training, office materials and advertising from the Local Member Grants Scheme.
Decision Maker: Local Councillor Decision - Skelmersdale East
Decision published: 19/10/2026
Effective from: 19/10/2026
Decision:
County Councillor Nigel Swales considered and rejected a Local Member Grant to West Lancs Debt Advice towards the cost of training.
The reason for the rejection is that CC Swales has no money left in his allocated grant funding.
Decision Maker: Local Councillor Decision - Ormskirk
Decision published: 16/10/2026
Effective from: 19/10/2026
Decision:
County Councillor Gordon Johnson considered and approved a Local Member Grant for the reduced amount of £100 to West Lancs Debt Advice towards the cost of training.
The reason for the reduction is that CC Johnson had multiple applications with limited funds and wanted to give as much money to as many organisations as possible.
Divisions affected: Burscough & Rufford; Ormskirk; Skelmersdale Central; Skelmersdale East; Skelmersdale West; West Lancashire East; West Lancashire North; West Lancashire West;
Lead officer: Local Member Grants
This report presents an application from a local organisation requesting £858.00 towards upgrading their fire alarm system from the Local Member Grants Scheme.
Decision Maker: Local Councillor Decision - West Lancashire West
Decision published: 16/10/2026
Effective from: 16/10/2026
Decision:
County Councillor Leon Graham considered and approved a Local Member Grant of £286 to Ormskirk Civic Hall towards the cost of upgrading their fire alarm system.
Decision Maker: Local Councillor Decision - West Lancashire East
Decision published: 16/10/2026
Effective from: 16/10/2026
Decision:
County Councillor Adrian Owens considered and approved a Local Member Grant of £286 to Ormskirk Civic Hall towards the cost of upgrading their fire alarm system.
Decision Maker: Local Councillor Decision - Ormskirk
Decision published: 16/10/2026
Effective from: 16/10/2026
Decision:
“County Councillor Gordon Johnson considered and approved a Local Member Grant of £286 to Ormskirk Civic Hall towards the cost of upgrading their fire alarm system.
Divisions affected: Ormskirk; West Lancashire East; West Lancashire West;
Lead officer: Local Member Grants
A decision on the Tarleton Academy - Inclusion base
Decision Maker: Director of Growth and Property
Decision published: 15/10/2026
Effective from: 15/07/2026
Decision:
Mica Aspinwall, Capital Programme Officer has taken a decision as set out in the report.
Divisions affected: West Lancashire North;
Lead officer: Mica Aspinwall
The Interim Head of Service Highways Operations and Design was asked to approve the decision to issue a Mini-competition for the supply of asphalt to Derby Street West, L39 3NH conducted in accordance with the Dynamic Purchasing System for the Provision of Asphalt, Aggregates & Concrete.
Decision Maker: Director of Highways and Transport
Decision published: 15/10/2026
Effective from: 15/10/2026
Decision:
Enda Garvey, Interim Head of Service Highway Operations and Design took the decision which has been delegated to him in accordance with 9.52 (50) of the Council's Scheme of Delegation to Officers, to approve the decision to issue a Mini-competition for the supply of asphalt to Derby Street West, L39 3NH conducted in accordance with the Dynamic Purchasing System for the Provision of Asphalt, Aggregates & Concrete.
Divisions affected: Ormskirk;
Lead officer: Enda Garvey
A decision on the approval to issue a Mini-competition for
supply of asphalt to Chain Lane, FY4 4XB.
Decision Maker: Director of Highways and Transport
Decision published: 15/10/2026
Effective from: 06/10/2026
Decision:
Enda Garvey, Interim Head of Service, Highways Operations and Design has taken a decision as set out in the report.
Divisions affected: Fylde West;
Lead officer: Enda Garvey
A decision on the approval to issue a Mini-competition for AC10 Asphalt Material for Various November Schemes.
Decision Maker: Director of Highways and Transport
Decision published: 15/10/2026
Effective from: 12/10/2026
Decision:
Enda Garvey, Interim Head of Service, Highways Operations and Design has taken a decision as set out in the report.
Divisions affected: Burnley Central East; Fleetwood West & Cleveleys West; Lancaster Rural North; Morecambe North; Morecambe South; Ormskirk; Pendle Rural; Ribble Valley North East; Skelmersdale East; Skerton; West Lancashire West; Wyre Rural East;
Lead officer: Enda Garvey
Request to approve the contract extension for Cycle Centred Behaviour Change Programme.
The county council currently works with Love to Ride Ltd to supply and deliver a cycle centred engagement and behaviour change programme targeted at Lancashire residents, businesses and communities.
This includes gamification, encouragement, competition, and reward structures; to help engage and sustain long-term active travel habits, the programme supports a healthy and fun competition element between or within organisations of a similar size or with multiple sites within and possibly outside Lancashire too.
Decision Maker: Director of Highways and Transport
Decision published: 15/10/2026
Effective from: 29/09/2026
Decision:
John Davies, Interim Director of Highways and Transport has taken a decision to approve to extend Cycle Centred Behaviour Change Programme.
Divisions affected: (All Divisions);
Lead officer: John Davies
The report will provide the Committee with information relating to:
• Current policy on tree management and replacement.
• How the council plants trees.
• Available funding.
• Data on trees planted and removed.
Decision Maker: Environment, Economic Growth and Transport Scrutiny Committee
Made at meeting: 17/09/2026 - Environment, Economic Growth and Transport Scrutiny Committee
Decision published: 14/10/2026
Effective from: 17/09/2026
Decision:
The Chair welcomed John Davies, Interim Director of Highways and Transport, and Paul Binks, Asset Manager (Highways – Principal Engineer), to the meeting. The report provided the committee with information relating to the current policy on tree management and replacement, how the council planted trees, available funding and data on trees planted and removed. A presentation to complement the report was provided at the meeting and a copy is set out in the minute book.
A summary of the discussion at the meeting is set out below.
• Routine works such as crown lifting and the removal of epicormic growth were not generally undertaken as a matter of course. However, where a concern was reported, or identified by an inspector, it would be assessed and, where appropriate, a works order raised.
• The county council did not have a general budget for planting trees within the highway. Highway tree planting was currently undertaken where it was funded through a specific project, such as a public realm improvement scheme.
• When trees formed part of wider public realm improvement schemes, the method and location of planting, including the possible use of containers or other planting arrangements, would be considered as part of the design of the scheme.
• Tree root pits were used to restrict the extent to which roots could spread and added to the overall cost of planting a tree within the highway.
• The quoted cost of approximately £2,000 to £10,000 related to planting an individual, substantial tree in a restricted highway location and did not represent the cost of all tree planting. Smaller trees or saplings planted could cost considerably less.
• The county council had an officer who specifically dealt with Section 154 notices concerning privately owned trees presenting a highway safety issue. The owner could be required to undertake the necessary work and, if they failed to do so, the county council could undertake the work itself. Recovery of the costs from the owner could, however, present difficulties.
• The allocation for addressing tree defects in 2026/27 was three times the amount available in previous years and formed part of wider safety-defect funding.
• The volume of tree safety work had increased significantly, particularly as a consequence of ash dieback, requiring the available resources to be prioritised according to risk.
• Tree works were undertaken on a risk-based approach. In exceptional cases requiring immediate action, emergency traffic management could be introduced and a tree removed within 24 hours. Other works could be assigned timescales of one, three, six or twelve months depending upon the assessed risk.
• Current resources were focused predominantly on the most urgent safety works, particularly those requiring action within one month. Works allocated a three-to-six-month timescale could be reassessed to establish whether the condition or level of risk had deteriorated.
• Tree works were undertaken using a combination of county council staff and external contractors, and the contractual arrangements for this work had been reviewed.
• Following the removal of an unsafe tree, subsequent works such as stump removal and stump grinding could be requested. These works were generally undertaken by contractors and grouped together for delivery.
• It was suggested that a recommendation be put to Cabinet on the creation of a separate budget to address accessibility issues and acknowledged that it would be useful to establish the number and scale of requests involving footways affected by tree roots, including raised or uneven paving, to provide a clearer picture of the extent of the issues.
• It was felt that any funding for replacement tree planting would need to be separate from the tree safety budget, so that expenditure on replacement planting did not compete with works necessary to address identified safety risks.
• It was acknowledged that the scale of accessibility and other non-emergency tree-related works would first need to be established so that any proposed budget could appropriately reflect the level of need. The timing of the discussion was considered appropriate as the county council was approaching its budget-setting process, with the wider budgets going to Full Council in February 2027 and the individual Highways Capital Programme being considered in March.
• The county council had been shortlisted for a National Forest bid. If successful in progressing further, this could result in substantial investment in Lancashire and potentially enable planting on a scale greater than anticipated losses from ash dieback and other causes.
• When selecting trees for highway locations, it was confirmed that consideration was given to the species and suitability of the location, applying the principle of the right species in the right place. It was acknowledged that, with current knowledge, some species used in previous highway planting schemes would not now be selected because of the problems they could cause.
In formulating recommendations, it was;
Resolved: That;
(i) The Environment, Economic Growth and Transport Scrutiny Committee recognised that the removal of danger is paramount and that the Cabinet Member for Highways and Transport gives consideration to:
a. Increasing the budget allocation to adequately address urgent and emergency works.
b. Introducing a separate budget to address lower priority work, for example because of accessibility, amenity, drainage issues and issues with self-seeded trees in hedgerows (cutting back/removal).
(ii) The Cabinet Member for Rural Affairs, Environment and Communities gives consideration to:
a. Taking advantage of new National Forestry funding and become part of the Northern Forest.
b. Encouraging volunteer micro forest planting across the county council area.
(iii) The Environment, Economic Growth and Transport Scrutiny Committee recognised the value of trees in the urban treescape and the benefit in terms of mitigating a warming climate and the provision of shade in town centres and that the Cabinet Member for Highways and Transport considers the introduction of a budget for tree replacement with a system of prioritisation.
Divisions affected: (All Divisions);
Lead officer: Paul Binks
To present the
constitution, membership, and Terms of Reference of
the
Environment, Economic Growth and Transport Scrutiny
Committee, as approved by
Full Council. This is an annual report that is presented to
the committee at its first
meeting following Full Council Annual General
Meetings.
Decision Maker: Environment, Economic Growth and Transport Scrutiny Committee
Made at meeting: 17/09/2026 - Environment, Economic Growth and Transport Scrutiny Committee
Decision published: 14/10/2026
Effective from: 17/09/2026
Decision:
Resolved: That the following be noted;
(i) The appointment of County Councillor Mark Wade as Chair and County Councillor Alice Jones as Deputy Chair of the Environment, Economic Growth and Transport Scrutiny Committee for the 2026-27 municipal year.
(ii) The constitution and membership of the Committee, as approved by Full Council at its Annual General Meeting held on 21 May 2026.
(iii) The Environment, Economic Growth and Transport Scrutiny Committee Terms of Reference.
(iv) The Cabinet Scrutiny Protocol.
Divisions affected: N/A;
Lead officer: Gary Halsall
To provide an overview of the outcome of the Lane Rental Feasibility Study.
Decision Maker: Environment, Economic Growth and Transport Scrutiny Committee
Made at meeting: 17/09/2026 - Environment, Economic Growth and Transport Scrutiny Committee
Decision published: 14/10/2026
Effective from: 17/09/2026
Decision:
The Chair welcomed John Davies, Interim Director of Highways and Transport, and Michael White, Highway Network Manager, to the meeting. The report outlined the findings of the feasibility study into what the benefits of a Lane Rental Scheme could be for Lancashire County Council. A presentation to complement the report was provided at the meeting and a copy is set out in the minute book.
A summary of the discussion at the meeting is set out below.
• It was acknowledged that the limited coverage of a lane rental scheme was an issue, with the proposed network covering only a relatively small proportion of all street works. Even if the scheme was expanded, a substantial proportion of works, around thirty thousand would remain outside the lane rental network.
• It was emphasised that a lane rental scheme would not prevent roadworks from taking place. Utility companies would continue to be entitled to undertake necessary works, with the scheme intended principally to provide greater control and encourage reductions in the duration and disruption caused by works, rather than eliminate roadworks altogether.
• The existing permit scheme would continue to operate alongside the lane rental scheme, providing controls in respect of works taking place on roads outside the lane rental network.
• It was acknowledged that once the scheme was established, there was a potential to increase the proportion of the network covered by lane rental to approximately 12–13%, although the majority of the highway network would still remain outside the scheme.
• It was highlighted that for emergency or urgent works, the first 48 hours would be exempt from lane rental charges. If the works continued beyond that period, lane rental charges would become payable, providing an incentive for utility companies to complete such works more quickly.
• For the purposes of the 48-hour exemption, works would be regarded as having commenced when traffic management was first placed on the highway, rather than when excavation physically began.
• Concerns regarding that the classification of works as urgent or emergency could be used inappropriately were acknowledged. It was reported that the county council could challenge classifications considered not to meet the relevant criteria, although ultimately utility companies had authority to determine their classification.
• The feasibility study had drawn upon experience and behavioural changes observed in existing lane rental schemes, including those operating in Kent, Surrey and London. However, officers noted that those areas differed from Lancashire, and the same outcomes could not therefore be assumed
• Development of the scheme would require a full cost-benefit analysis, detailed assessment of the relevant data, consultation with utility companies and an application to the Department for Transport.
• Previous experience suggested that consultation with utility companies could be lengthy because of objections and detailed representations. The Department for Transport approval process was expected to take at least four months.
• It was acknowledged that implementation at the start of a financial year would simplify subsequent monitoring and administration, officers indicated that a Lancashire-only scheme could potentially be introduced around November or December 2027, rather than April 2028.
• It was confirmed that utility companies were permitted to pass costs arising from lane rental on to customers. However, whilst there was no information available to quantify the likely effect on individual customers’ bills, the implications of this could be considered as part of the cost-benefit analysis or even explored further during consultation with utility companies.
• Indicative potential charges to utility companies were stated as being in the region of £4.5 million to £9.5 million, although the amount ultimately passed on to customers, if any, could not be determined.
• One reason suggested for the relatively low number of authorities operating lane rental schemes was their restricted network coverage, meaning that most street works would remain outside the lane rental arrangements.
• Indicative annual staffing and IT costs associated with operating the scheme were approximately £500,000.
• Officers clarified that the scheme was not intended as a means of generating unrestricted income for the county council. A surplus could arise, but its use would be subject to statutory requirements and any surplus generated, 50% would have to be reinvested in highway maintenance, with decisions on the use of the remaining 50% being considered through a board involving the county council and utility companies.
• Discussions on whether Blackburn with Darwen and Blackpool Councils wished to participate in a wider scheme were planned. They had previously been invited to participate in the feasibility study but had not taken up that opportunity.
• Utility companies could already coordinate works and share closures and permit fees could be waived to encourage collaborative working. However, the committee was informed that such coordination between utility companies occurred infrequently in practice.
• The National Street Manager system enabled utility companies to see other planned works on a street, meaning that the information required to facilitate coordination was available.
• When the county council resurfaced a road, it could impose a Section 58 restriction, preventing planned utility works for a period of two years. Immediate or urgent works and certain other exempt works could nevertheless still take place during that period.
In formulating recommendations, it was suggested that a report be presented to the Cabinet in December 2026 on the implementation of a Lane Rental Scheme for the Lancashire County Council area. Upon further consideration of timescales and the potential for a joint scheme with Blackburn with Darwen and Blackpool Councils, it was;
Resolved: That;
(i) The Environment, Economic Growth and Transport Scrutiny Committee recommends to the Cabinet Member for Highways and Transport that subject to the outcomes of discussions with Blackburn with Darwen Council and Blackpool Council, a report be presented to Cabinet in December 2026 on the implementation of a Lane Rental Scheme for the Lancashire County Council area.
(ii) Subject to the Cabinet Member for Highway and Transport's acceptance of the committee's recommendation at (i) above, and subsequent approval by Cabinet,
a. The Cabinet Member for Highways and Transport gives consideration to writing to all Lancashire MPs asking for their support and the potential to fast track the county council's application for a Lane Rental Scheme to the Department for Transport.
b. The Environment, Economic Growth and Transport Scrutiny Committee receive a quarterly progress report on the implementation of the scheme.
Divisions affected: (All Divisions);
Lead officer: Michael White
This report
provides members of the Environment, Economic Growth and
Transport
Scrutiny Committee with the work programme for 2026/27. The
work programme is a
work in progress document and topics can be moved or added to
the programme to
respond to any emerging priorities.
Decision Maker: Environment, Economic Growth and Transport Scrutiny Committee
Made at meeting: 17/09/2026 - Environment, Economic Growth and Transport Scrutiny Committee
Decision published: 14/10/2026
Effective from: 17/09/2026
Decision:
The committee received the work programme for the 2026/27 municipal year. In addition, a formal written response to the committee's recommendations on Local Electric Vehicle Infrastructure was received from the Cabinet Member for Rural Affairs, Environment and Communities. Formal written responses to the committee's recommendations on Public Rights of Way – Processes, Street Lighting column routine structural surveys, and Gully Cleansing regime in the Highway Asset Management Plan, were also received from the Cabinet Member for Highways and Transport.
In discussing the response to the committee's recommendations on Public Rights of Way - Processes at Appendix 'C', it was noted that a further response would come back from the Cabinet Member.
In relation to the response on street lighting, it was felt that certain aspects had been missed and that answers and assurances be sought on the following questions:
• How will councillors be able to provide feedback and contribute to decisions about whether a street lighting column should be replaced when it is removed?
• Does the proposed approach include ongoing partnership working with the local police to identify areas considered particularly vulnerable?
• Is the information received from the police a one-off data exchange, or will there be ongoing information sharing with the police?
The committee welcomed the response to its recommendations on the gully cleaning regime. It was further suggested that an additional point regarding reported gullies "being on a surface water run-off route to an area with a history of flooding" be included in the 'History of the Area' section of the supplementary guidance and for this to be put to the Cabinet Member.
A request was made for a future presentation to be provided by appropriate representatives of the combined authority in partnership with Lancashire County Council officers on Lancashire’s economic growth and inward-investment opportunities.
A request was also made for a future presentation on strategic development and infrastructure to include an update on proposed rail schemes, including Cottam railway station and the potential Colne–Skipton and Fleetwood–Poulton rail links. It was suggested that this could form part of a wider presentation on economic growth, infrastructure and investment opportunities. In response it was suggested that Bite Size Briefings could be arranged to facilitate these presentations.
It was agreed that Residents Parking Schemes be included on the committee's work programme for review. A request was made on whether the waste strategy and anaerobic digestive savings topic could be added to the work programme.
Resolved: That;
(i) Subject to the inclusion of Resident Parking Schemes as a topic for review, the Environment, Economic Growth and Transport Scrutiny Committee Work Programme for 2026/27 at Appendix 'A', be agreed.
(ii) The formal written response from County Councillor Joshua Roberts, Cabinet Member for Rural Affairs, Environment and Communities to the Committee's recommendations on Local Electric Vehicle Infrastructure at Appendix 'B' be noted.
(iii) The formal written response from County Councillor Warren Goldsworthy, Cabinet Member for Highways and Transport to the Committee's recommendations on Public Rights of Way - Processes at Appendix 'C', be noted, and that a further response will come back.
(iv) The formal written response from County Councillor Warren Goldsworthy, Cabinet Member for Highways and Transport to the Committee's recommendations on Street Lighting column routine structural surveys at Appendix 'D', be noted, and that the committee's questions set out in the minutes above be shared with the Cabinet Member for response.
(v) The formal written response from County Councillor Warren Goldsworthy, Cabinet Member for Highways and Transport to the Committee's recommendations on Gully Cleansing regime in the Highway Asset Management Plan at Appendix 'E', be noted and suggested that an additional point regarding reported gullies "being on a surface water run-off route to an area with a history of flooding" be included in the 'History of the Area' section of the supplementary guidance.
Divisions affected: (All Divisions);
Lead officer: Gary Halsall
This report sets out a request made by members of the Environment, Economic Growth and Transport Scrutiny Committee at its work programming session held on 25 June 2026 to establish a task group to review highways maintenance and the right first time approach. A draft terms of reference for the task group is also included.
Decision Maker: Environment, Economic Growth and Transport Scrutiny Committee
Made at meeting: 17/09/2026 - Environment, Economic Growth and Transport Scrutiny Committee
Decision published: 14/10/2026
Effective from: 17/09/2026
Decision:
A report setting out a request to establish a task group to review highways maintenance and the right first time approach was presented. Members were asked to agree the proposed objectives and outcomes set out in the report.
Members expressed support for the establishment of the Task Group. It was noted that the proposal had also been unanimously supported by the Budget and Finance Scrutiny Committee and that the review would provide an opportunity to examine highways maintenance practices, contractor performance and opportunities for service improvement.
In considering the proposed scope of the review it was agreed that reference to Local Government Reorganisation be removed from the objective. It was also agreed that the reference to the new managed service contract was only one aspect of concern and should therefore appear in brackets. It was felt that the review should also have regard to wider highway maintenance issues, including pavements and town centre paving, and should compare Lancashire’s approach with practices elsewhere. It was noted that the Task Group would determine its detailed areas of focus and that the Chair would be appointed at its first meeting.
Discussion took place regarding the composition of the Task Group and whether political balance requirements were necessary for a scrutiny task group. Subject to confirmation of the rules, the following county councillors expressed a desire to sit on the task group:
- Azhar Ali
- Alice Jones
- John Singleton
- Paul Stubbins
- Joel Tetlow
- David Whipp
Resolved: That a task group to review highways maintenance and the right first time approach be established and membership confirmed subject to advice on political balances.
Divisions affected: (All Divisions);
Lead officer: Gary Halsall
Decision Maker: Environment, Economic Growth and Transport Scrutiny Committee
Made at meeting: 17/09/2026 - Environment, Economic Growth and Transport Scrutiny Committee
Decision published: 14/10/2026
Effective from: 17/09/2026
Decision:
Resolved: That, the minutes of the meeting held on 23 April 2026, be confirmed as an accurate record and signed by the Chair.
Decision Maker: Head of Service Democratic Services
Decision published: 14/10/2026
Effective from: 14/10/2026
Divisions affected: (All Divisions);
Lead officer: Champion Grants
This report presents an application from an organisation requesting £250.00 towards 5 monthly meetings, a social outing for members and a meal contribution from the Champion for Older People budget.
Decision Maker: Head of Service Democratic Services
Decision published: 14/10/2026
Effective from: 14/10/2026
Decision:
The Head of Democratic Services, following consultation with
County Councillor Janet Schofield, Champion for Older People,
rejected a Champions Grant application to Preston and District 50+
Forum towards the cost of 5 monthly meetings, a social outing for
members and a meal contribution
The reason for the rejection was due to a lack of
funding.
Divisions affected: (All Divisions);
Lead officer: Champion Grants
This report presents an application from an organisation requesting £800.00 towards their annual Christmas lunch from the Champion for Older Peoples budget.
Decision Maker: Champion for Older People
Decision published: 14/10/2026
Effective from: 14/10/2026
Decision:
The Head of Democratic Services, following consultation with
County Councillor Janet Schofield, Champion for Older People,
rejected a Champions Grant application to St Mary Magdalen and St
Teresa St Vincent de Paul Society, Penwortham towards the cost of
their annual Christmas lunch
The reason for the rejection was due to a lack of
funding.
Divisions affected: (All Divisions);
Lead officer: Champion Grants
This report presents an application from an organisation requesting £345.00 towards 16 Toby Carvery midweek festive roast dinners and for the minibus hire from Morecambe/Lancaster to Blackpool and back from the Champion for Older People budget.
Decision Maker: Head of Service Democratic Services
Decision published: 14/10/2026
Effective from: 14/10/2026
Decision:
The (Acting) Head of Democratic Services, following
consultation with County Councillor Janet Schofield, Champion for
Older People, rejected a Champions Grant application to Branksome
Good Neighbours towards the cost of 16 Toby Carvery midweek festive
roast dinners and for the minibus hire from Morecambe/Lancaster to
Blackpool and back.
The reason for the rejection was due to a lack of
funding.
Divisions affected: (All Divisions);
Lead officer: Champion Grants
This report presents an application from an organisation requesting £2000.00 towards the cost of Coaches from Ava Coach in Leyland to take older residents of Lancashire on trips, outings and social activities from the Champion for Older People budget.
Decision Maker: Champion for Older People
Decision published: 14/10/2026
Effective from: 14/10/2026
Decision:
The Head of Democratic Services, following consultation with
County Councillor Janet Schofield, Champion for Older People,
rejected a Champions Grant application to Regenerage towards the
cost of Coaches from Ava Coach in Leyland to take older residents
of Lancashire on trips, outings and social activities
The reason for the rejection was due to a lack of
funding.
Divisions affected: (All Divisions);
Lead officer: Local Member Grants
The report contains the update to the Health and Wellbeing Board on the Lancashire Better Care Fund.
Included in the October 2026 update is an update on progress in developing the 2026/27 Lancashire Better Care Fund (BCF) Plan, and the corresponding Section 75 agreement, and how the BCF is supporting Lancashire's wider Route to Integration programme.
This report has been prepared on behalf of the Co-Chairs of the Lancashire Better Care Fund Board, Matt Emerson, Director of Strategic Commissioning and Quality, Lancashire County Council (LCC) and Jane Cass, Director of Partnerships and Collaboration/Deputy Chief Operating Officer, NHS Lancashire and South Cumbria Integrated Care Board (ICB), for the Health and Wellbeing Board.
Decision Maker: Executive Director of Adults, Health and Wellbeing
Decision published: 13/10/2026
Effective from: 13/10/2026
Decision:
Helen Coombes, the Executive Director of Adults, Health and Wellbeing, following consultation with the Lancashire Health and Wellbeing Board members:
i. Approved the 2026/27 Better Care Fund Plan;
ii. Noted and approved the progress and development of the Section 75 agreement, in readiness for signing post the approval of the 2026/27 Better Care Fund Plan; and
iii. Noted and approved the role of the Better Care Fund in supporting Lancashire's wider Route to Integration programme.
Divisions affected: (All Divisions);
Lead officer: Andy Milroy
A decision on the Land Sale - Land at Golden Hill (Short Stay) School, Earnshaw Drive, Leyland, PR25 1QS.
Decision Maker: Director of Growth and Property
Decision published: 13/10/2026
Effective from: 28/09/2026
Decision:
Gary Pearse, Head of Estates has taken a decision as set out in the report.
Divisions affected: Chorley Central;
Lead officer: Gary Pearse
Please move
£7,420.37 from 17003 to 16989
Please move £2,018.03 from 17003 to 17400
Decision Maker: Director of Highways and Transport
Decision published: 13/10/2026
Effective from: 28/09/2026
Decision:
John Davies, Head of Highways Network Management has taken a decision to approve the Transfer of Budget to clear unprocessed costs Capital Resurfacing.
Divisions affected: (All Divisions);
Lead officer: John Davies
Authority to enter into a S106 Agreement to secure a secondary education contribution. As this is an Outline Application the actual contribution amount will be determined following at Reserved Matters application stage, when dwelling bedroom information becomes available. Indexation will be applied to the contribution at point of payment.
Decision Maker: Director of Education and Inclusion
Decision published: 12/10/2026
Effective from: 01/10/2026
Decision:
Paul Turner, Director of Education and Inclusion has taken a decision to approve the S106 Agreement to secure a secondary education contributions in relation to Planning Application 3/00257/OUTMAJ- Land at The Bungalow, Hornby Road, Chorley, PR6 0LT.
Divisions affected: Chorley South;
Lead officer: Paul Turner
The proposals are being pursued as part of a Section 278
agreement under the Highways Act 1980. These proposals are being
funded fully by the development linked to the new cricket ground
and the future housing development and the associated planning
conditions.
The proposals include the removal and relocation of the
existing bus stops to more suitable positions and to support their
upgrade to quality bus stops. This is to allow the buses to pull in
and out safely and allow for effective enforcement.
A raised boarding platform will also be installed to ensure
safe boarding and alighting of mobility impaired passengers and
ensure the bus stops are fully mobility compliant. Bus shelters are
also to be provided.
Consultations
Formal consultation was carried out between 28 August 2026
and 25 September 2026 included frontagers to the proposed location
of the Bus Stop being notified and notices being displayed on site.
Divisional county councillors were consulted along with the
council's usual consultees.
Following formal consultation No Objections were
received.
Decision Maker: Director of Highways and Transport
Decision published: 12/10/2026
Effective from: 05/10/2026
Decision:
Peter Bell, Highway Regulation Manager has taken a decision to approve the Lancashire County Council (Stanifield Lane, Lostock Hall, South Ribble Borough) (Introduction and Removal of Bus Stop Clearways) Legal Reference: LSG4/105802/AFR.
Divisions affected: Moss Side & Farington;
Lead officer: Peter Bell
The proposals are being pursued as part of a Section 278
agreement under the Highways Act 1980. These proposals are being
funded fully by the development linked to the new cricket ground
and the future housing development and the associated planning
conditions.
The purpose of the proposed Toucan crossing is to provide a
safe crossing point for cyclists and pedestrians to promote
sustainable travel and promote social inclusion. The proposal seeks
to mitigate against the increase in traffic and pedestrian
movements generated by the new developments.
Consultations
Formal consultation was carried out between 28 August 2026
and 25 September 2026 which included advertising in the local press
and notices being displayed on site. Divisional county councillors
were consulted along with the council's usual consultees and the
consultation documents posted on the council's
website.
Following formal consultation No Objections were
received.
Decision Maker: Director of Highways and Transport
Decision published: 12/10/2026
Effective from: 05/10/2026
Decision:
Peter Bell, Highway Regulation Manager has taken a decision to approve the LANCASHIRE COUNTY COUNCIL (STANIFIELD LANE, LOSTOCK HALL, SOUTH RIBBLE BOROUGH) (PEDESTRIAN CROSSING) Legal Reference: LSG4/105801AFR.
Divisions affected: Moss Side & Farington;
Lead officer: Peter Bell
A decision on the SIP Network Provider.
Decision Maker: Director of Digital
Decision published: 12/10/2026
Effective from: 12/10/2026
Decision:
Carol Groom, Head of Digital Commissioning has taken a decision as set out in the report.
Divisions affected: None;
Lead officer: Carol Groom
The proposals are being pursued as part of a Section 278
agreement under the Highways Act 1980. These proposals are being
funded fully by the development linked to the new cricket ground
and the future housing development and the associated planning
conditions.
The proposed No Waiting at Any Time restrictions are intended
to protect visibility at the access, ensure the safe operation of
public transport services, aid with pedestrian safety to cross
Stanifield Lane and prevent inappropriate and obstructive parking
associated with visitors to the cricket ground.
Reasons under Section 1 of the RTRA
(a) for avoiding danger to persons or other traffic using the
road or any other road or for preventing the likelihood of any such
danger arising
(c) for facilitating the passage on the road or any other
road of any class of traffic (including pedestrians)
(d) for preventing the use of the road by vehicular traffic
of a kind which, or its use by vehicular traffic in a manner which,
is unsuitable having regard to the existing character of the road
or adjoining property
Consultations
Formal consultation was carried out between 28 August 2026
and 25 September 2026 which included advertising in the local press
and notices being displayed on site. Divisional county councillors
were consulted along with the council's usual consultees and the
consultation documents posted on the council's
website.
Following formal consultation No Objections were
received.
Decision Maker: Director of Highways and Transport
Decision published: 12/10/2026
Effective from: 05/10/2026
Decision:
Peter Bell, Highway Regulation Manager has taken a decision to approve the LANCASHIRE COUNTY COUNCIL (STANIFIELD LANE AREA, LOSTOCK HALL, SOUTH RIBBLE BOROUGH) (PROHIBITION OF WAITING) ORDER 202* Legal Reference: LSG4/105803/AFR
Divisions affected: Moss Side & Farington;
Lead officer: Peter Bell
This report presents an application from a local organisation requesting £2000.00 towards establishing a community health and wellness practice from the Local Member Grants Scheme.
Decision Maker: Local Councillor Decision - West Lancashire North
Decision published: 10/10/2026
Effective from: 10/10/2026
Decision:
County Councillor Thomas de Freitas considered and approved a Local Member Grant for the reduced amount of £500 to Tarleton Rugby Club towards the cost of establishing a community health and wellness practice from the club.
The reason for the reduction is that CC de Freitas is reserving funding for alternative organisations operating within his division.
Divisions affected: West Lancashire North;
Lead officer: Local Member Grants
Statement of Reasons
The proposals are part of the wider Bus Service Improvement
Plans (BSIPs) and aim to enhance bus services and amenities for
passengers by introducing raised boarding areas and traffic
regulation orders so that buses can arrive and depart efficiently
and safely. The proposal includes Bus Stop Clearways and Bus Stands
to prioritise bus services and encourage the use of public
transport.
Consultation
Formal consultation was carried out between 9 July 2026 and 6
August which included frontagers to the proposed location of the
Bus Stop being notified and notices being displayed on site.
Divisional county councillors were consulted along with the
council's usual consultees.
Following formal consultation four responses were received.
Whilst none of the respondents objected to the proposal, three
raised additional comments and concerns. The main points raised in
the responses along with Officer comments are outlines in Appendix
C.
Decision Maker: Director of Highways and Transport
Decision published: 09/10/2026
Effective from: 09/10/2026
Decision:
Pete George, the Head of the Pension Fund, on behalf of the Corporate Director of Finance took a decision to approve County Councillors A Joynes and Coopted member Mr P Crewe from the Pension Fund Committee to attend the Pensions UK Annual Conference which will be held on the 13-15 October 2026 at LEX Liverpool and the payment of any associated delegate fee, travel or accommodation costs as appropriate by the Lancashire County Pension Fund.
Divisions affected: Clitheroe;
Lead officer: Peter Bell
A decision on the Lancaster CAPSS - SEND Provision Building Improvement Works.
Decision Maker: Director of Growth and Property
Decision published: 09/10/2026
Effective from: 18/09/2026
Decision:
Phil Green, Executive Director of Place has taken a decision as set out in the report.
Divisions affected: Skerton;
Lead officer: Phil Green
A decision on the School Budgeting System.
Decision Maker: Corporate Director of Finance
Decision published: 09/10/2026
Effective from: 08/10/2026
Decision:
Khadija Saeed, Head of Corporate Finance has taken a decision as set out in the report.
Divisions affected: N/A;
Lead officer: Khadija Saeed
As part of the
normal process of service delivery, the approved highways capital
programme now requires amendments to allow effective delivery the
Programme.
Head of Service is asked to approve the reallocation of
residual funds from a completed project at Calder Vale to an
ongoing project in the Trough of Bowland.
Request details:
Transfer £50,000
From
Completed project: ID 17035 26/27 Calder Vale Road -
Barnacre-with-Bonds - Adjacent to 1-2 Victoria Terrace
To
In progress project: ID 17034 26/27 Sykes Farm Retaining Wall
32995 and Blaze Moss Culvert.
The reallocation is between projects in the same programme
and there is no change to the total approved budget.
The changes are required because additional work is required
to complete essential works at Sykes Farm and Blaze
Moss.
This item does not require cabinet approval.
Christopher Wilding
Bridges and Geotechnical Design Manager
6th October 2026
Decision Maker: Director of Highways and Transport
Decision published: 09/10/2026
Effective from: 06/10/2026
Decision:
Enda Garvey, Interim Head of Highways Operations and Design has taken a decision to approve the proposed amendments to the Highways, Bridges Maintenance Capital Programme.
Divisions affected: Longridge with Bowland;
Lead officer: Enda Garvey
The proposals
are being pursued as part of a Section 278 agreement under the
Highways Act 1980. These proposals are being funded fully by the
development linked to the new cricket ground and the future housing
development and the associated planning conditions.
The purpose of the proposed 40mph speed limit is to improve
the safety of motorised and non-motorised users, mitigating against
additional traffic flows and pedestrian movements from new cricket
ground and future housing development.
The proposals also seek to implement a Speed Limit Order for
the sections of National Speed Limit (derestricted), where street
lighting is present. The signage has been in place for a number of
years but has had no formal Order in place to allow for effective
enforcement. There will be no changes to these restrictions or
their extents on site. Therefore, drivers will not be subject to
any changes as a result of this part of the proposals.
Consultations
Formal consultation was carried out between 28 August 2026
and 25 September 2026 which included advertising in the local press
and notices being displayed on site. Divisional county councillors
were consulted along with the council's usual consultees and the
consultation documents posted on the council's
website.
Following formal consultation No Objections were
received.
Decision Maker: Director of Highways and Transport
Decision published: 09/10/2026
Effective from: 05/10/2026
Decision:
Peter Bell, Highway Regulation Manager has taken a decision to approve the LANCASHIRE COUNTY COUNCIL (FARINGTON ROAD, LONDON WAY, LOSTOCK LANE AND STANIFIELD LANE, BAMBER BRIDGE, LOSTOCK HALL AND WALTON LE DALE, SOUTH RIBBLE BOROUGH) (40MPH AND DE-RESTRICTED SPEED LIMITS) ORDER 202* Legal Reference: LSG4/105804/AFR.
Divisions affected: Moss Side & Farington;
Lead officer: Peter Bell
Authorisation for a member of the Pension Fund Committee to participate in external pension related training and the payment of any associated costs by the Lancashire County Pension Fund.
Decision Maker: Corporate Director of Finance
Decision published: 09/10/2026
Effective from: 24/09/2026
Decision:
Pete George, Head of Pension Fund has taken a decision to approve the Participation in the online Fundamentals Training – Oct, Nov and Dec 2026.
Divisions affected: None;
Lead officer: Peter George
Allocation of
the additional £10m Highways capital funding approved at
September Cabinet as follows:
£7m to support the 26/27 Structural Defects Managed
Service project (PPMS ID: 17101) in order to meet projected service
demand for the remainder of the 26/27 financial year.
£3m for pre-patching and preparatory works to support
the 27/28 surface dressing programme.
Decision Maker: Director of Highways and Transport
Decision published: 09/10/2026
Effective from: 06/10/2026
Decision:
Enda Garvey, Interim Head of Highways Operations and Design has taken a decision to approve the allocation of the additional £10m Highways capital funding approved at September Cabinet.
Divisions affected: (All Divisions);
Lead officer: Enda Garvey
A decision on the Children's Services Information Systems and Case Management.
Decision Maker: Director of Digital
Decision published: 09/10/2026
Effective from: 25/09/2026
Decision:
Chris Rawding, Director of Digital has taken a decision as set out in the report.
Divisions affected: (All Divisions);
Lead officer: Chris Rawding
A decision to approve the award from a mini competition exercise at Burnley Ightenhill Primary School - Fire alarm Installation
Decision Maker: Director of Growth and Property
Decision published: 09/10/2026
Effective from: 08/10/2026
Decision:
Scott Smith, Building Group Manager has taken a decision as set out in the report.
Divisions affected: Burnley Central West;
Lead officer: Scott Smith
This report presents an application from a local organisation requesting £883 towards Display boards, banners, easels and a display case for our Pop-Up Heritage Centre, that we plan to run in the Covered Market from the Local Member Grants Scheme.
Decision Maker: Local Councillor Decision - Preston South West
Decision published: 09/10/2026
Effective from: 09/10/2026
Decision:
County Councillor Mark Jewell considered and approved a Local Member Grant of £441.50 to Preserving Preston’s Heritage CIC towards the cost of display boards, banners, easels and a display case for our Pop-Up Heritage Centre, that we plan to run in the Covered Market.
Divisions affected: Preston Rural; Preston South West;
Lead officer: Local Member Grants
A decision on the Registrars Booking Solution.
Decision Maker: Director of Communities & Engagement
Decision published: 09/10/2026
Effective from: 25/09/2026
Decision:
Georgina Roby, Head of Cultural Services has taken a decision as set out in the report.
Divisions affected: (All Divisions);
Lead officer: Georgina Roby
Authorisation for members of the Pension Fund Committee to attend external pension related training, and the payment of any associated delegate fees, travel, and accommodation costs by the Lancashire County Pension Fund.
Decision Maker: Corporate Director of Finance
Decision published: 09/10/2026
Effective from: 24/09/2026
Decision:
Pete George, Head of Pension Fund has taken a decision to approve the Attendance at the Pensions UK Annual Conference 13-15 October 2026 at LEX Liverpool.
Divisions affected: None;
Lead officer: Peter George
Transfere
monies to cover unprocessed costs on schemes
delivered.
From 17154 to 17212 = £182.84 and From 17154 to 17220 =
£7.13 also From 17154 to 17158 = £82.38
Decision Maker: Director of Highways and Transport
Decision published: 09/10/2026
Effective from: 25/09/2026
Decision:
Enda Garvey, Interim Head of Highways Operations and Design has taken a decision to approve the Transfer of Budgets on surface treatment costs No 2.
Divisions affected: (All Divisions);
Lead officer: Enda Garvey
A decision on the land Sale via Private Treaty - Land to the rear of 6 Rochdale Road SDO 2627-93.
Decision Maker: Director of Growth and Property
Decision published: 09/10/2026
Effective from: 09/10/2026
Decision:
Gary Jones, Estates Manager, on behalf of Simon Lawrence, Director of Growth and Property took a decision to approve the sale of land.
Divisions affected: Rossendale South;
Lead officer: Gary Jones
Lancashire
County Council currently has a contract in place for The Provision
of Waste Automotive Batteries, Collection, Transportation and
Processing Services that was awarded to Maxilead Limited in 2025
following a tender exercise.
The contract provides services for the collection and
processing of waste automotive batteries left at disposal sites by
the general public. These items include car batteries (from
petrol/diesel cars only), golf cart batteries, motorcycle
batteries, wheelchair/mobility scooter batteries and leisure
batteries. The contract also provides the Council with a net income
from the recovered materials.
The current contract commenced 01 February 2025, and the
initial term is due to expire 31 January 2027. Under the existing
terms and conditions, the contract has the provision for extension
by any number of defined periods up to a maximum of 24 months. The
contract requires the Council to provide a minimum of three months'
notice to the supplier if the Council wishes to activate an
extension.
This decision relates to the approval of the activation of
the full permitted 24-month extension to The Provision of Waste
Automotive Batteries, Collection, Transportation and Processing
Services contract. The new end date of the contract will be 31
January 2029, following which no further extension is
applicable.
Decision Maker: Director of Environment and Regulatory
Decision published: 09/10/2026
Effective from: 06/10/2026
Decision:
Steve Scott, Head of Waste Management has taken a decision to approve the Extension of contract for The Provision of Waste Automotive Batteries, Collection, Transportation and Processing Services.
Divisions affected: (All Divisions);
Lead officer: Steve Scott
A decision on the Electronic Merchant Payment Service 2.
Decision Maker: Corporate Director of Finance
Decision published: 09/10/2026
Effective from: 05/10/2026
Decision:
Gary Fielding, Director of Corporate Finance has taken a decision as set out in the report.
Divisions affected: (All Divisions);
Lead officer: Gary Fielding
A decision on the NBS Chorus Subscription Renewal.
Decision Maker: Director of Digital
Decision published: 09/10/2026
Effective from: 25/09/2026
Decision:
Chris Rawding, Director of Digital has taken a decision as set out in the report.
Divisions affected: (All Divisions);
Lead officer: Chris Rawding
The purpose of the proposed Bus Stops clearways are to
support the upgrade of the existing bus stops to quality bus stops.
This is to allow the buses to pull in and out safely and allow for
effective enforcement.
A raised boarding platform will also be installed to ensure
safe boarding and alighting of mobility impaired passengers and
ensure the bus stops are fully mobility compliant.
The proposals are being pursued as part of a Section 278
agreement under the Highways Act 1980. These proposals are being
funded fully by the developer and are linked to the extension of
Broughton-in-Amounderness CoE Primary School and the associated
planning conditions.
Consultations
For Bus Stops - Formal consultation was carried out between
24th July 2026 until 21st August 2026 which included frontagers to
the proposed location of the Bus Stop being notified and notices
being displayed on site. Divisional county councillors were
consulted along with the council's usual consultees.
Following formal consultation No Objections were
received.
Decision Maker: Director of Highways and Transport
Decision published: 08/10/2026
Effective from: 22/09/2026
Decision:
Peter Bell, Highway Regulation Manager has taken a decision to approve the Lancashire County Council (Garstang Road, Preston, Preston City) (Bus Stop Clearways).
Divisions affected: Preston Rural;
Lead officer: Peter Bell
South Ribble Borough Council is prompting the transformation
and improvement of Leyland Town Centre.
The aims are to create a new vibrant heart to the town and a
business hub development incorporating workspace, events and skills
including dedicated office accommodation.
Phase 1 of the scheme includes the relocation of an existing
car park on Ecroyd Street and the construction of new
dwellings.
These works are being pursued as part of a Section 278
agreement under the Highways Act 1980 associate with the Leyland
Town Centre Improvement scheme.
The proposals include the following:
Ecroyd Street
• Introduction of No Waiting at Any Time restrictions,
extending along both sides for its full extent. This measure is
required to facilitate future commercial development resulting from
the relocation of the existing market parking facility. The
restriction will ensure the carriageway remains unobstructed for
larger vehicles that will require access for servicing
activities.
Quin Street U5734 (existing extent)
• Introduction of No Waiting at Any Time restrictions at
both junctions of Quin Street—at John Street and at Hough
Lane, and along the eastern side of Quin Street. The restrictions
are intended to accommodate a new footway on the eastern side of
Quin Street and resident parking bays on the western side, whilst
maintaining clear access and enhancing visibility for vehicles at
both junctions
• Amending the extent of the No Waiting restriction on
the western side of Quin Street to facilitate the provision of new
permit holders parking and ensure the restriction aligns
appropriately with the revised highway layout.
• Extending the hours of the No Loading restrictions at
its junction with Hough Lane, to prevent service-related parking
during the town centre’s peak operating period and ensure
clear access and improved visibility at the Quin Street
junction.
• Introduction of an additional 6 properties to the
eligibility list of residents able to purchase permits for zone
1
• Introduction of a continuous permit holders only bay
to accommodate additional vehicles resulting from the new
residential development on the north-western side of Quin Street.
This amendment ensures the parking provision appropriately supports
the available residential parking within zone 1
• Removal of the existing residents parking bay on the
western side of Quin Street and a reduction in the length of the
residents parking bay on the eastern side, both at the Hough Lane
junction, to support the revised road layout and ensure continued
provision for two-way traffic.
• Extension of the hours of operation of the existing
residents parking and limited waiting bay on the eastern side of
Quin Street at the Hough Lane junction to align with the timings of
nearby restrictions.
Quin Street (North Of John Street – new
extent)
• Introduction of No Waiting at Any Time restrictions
along the entire length of this new, limited-width section of Quin
Street. This measure will maintain safe and unobstructed access to
the adjacent off-street parking bays, which will remain
unrestricted.
REASONS UNDER Section 1 of the RTRA
(a) for avoiding danger to persons or other traffic using the
road or any other road or for preventing the likelihood of any such
danger arising
(c) for facilitating the passage on the road or any other
road of any class of traffic (including pedestrians)
(f) for preserving or improving the amenities of the area
through which the road runs
Consultations
Formal consultation was carried out between 24th July 2026
and 21st August 2026. which included advertising in the local press
and notices being displayed on site. Divisional county councillors
were consulted along with the council's usual consultees and the
consultation documents posted on the council's
website.
Following formal consultation No Objections were
received.
Decision Maker: Director of Highways and Transport
Decision published: 08/10/2026
Effective from: 22/09/2026
Decision:
Peter Bell, Highway Regulation Manager has taken a decision to approve the LANCASHIRE COUNTY COUNCIL (ECROYD STREET AND QUIN STREET, LEYLAND, SOUTH RIBBLE BOROUGH) (REVOCATION, AMENDMENT TO PERMIT PARKING AND VARIOUS PARKING RESTRICTIONS) ORDER 202*Legal Reference: LSG4/104392/AFR.
Divisions affected: Leyland Central;
Lead officer: Peter Bell
South Ribble Borough Council is prompting the transformation
and improvement of Leyland Town Centre.
The aims are to create a new vibrant heart to the town and a
business hub development incorporating workspace, events and skills
including dedicated office accommodation.
Phase 1 of the scheme includes the relocation of an existing
car park on Ecroyd Street and the construction of new
dwellings.
These works are being pursued as part of a Section 278
agreement under the Highways Act 1980 associate with the Leyland
Town Centre Improvement scheme.
The proposals include the following:
• Introduction of a raised junction table to encourage
self-enforcement of the speed limit, thereby enhancing highway
safety for all users, improving pedestrian safety, and reducing the
impact of additional traffic generated by the new
development.
Consultations
Formal consultation was carried out between 24th July 2026
and 21st August 2026. which included advertising in the local press
and notices being displayed on site. Divisional county councillors
were consulted along with the council's usual consultees and the
consultation documents posted on the council's
website.
Following formal consultation No Objections were
received.
Decision Maker: Director of Highways and Transport
Decision published: 08/10/2026
Effective from: 22/09/2026
Decision:
Peter Bell, Highway Regulation Manager has taken a decision to approve the Lancashire County Council (Ecroyd Street, John Street And Quin Street, Leyland, South Ribble Borough) (Junction Table) LSG4/104391/AFR.
Divisions affected: Leyland Central;
Lead officer: Peter Bell
This proposal intends to correct an anomaly in the existing
Traffic Regulation Order regarding the stated road
names.
It thereby aims to confirm the existing 7.5t weight
restriction and ensure effective enforcement.
REASONS UNDER Section 1 of the RTRA
(a) for avoiding danger to persons or other traffic using the
road or any other road or for preventing the likelihood of any such
danger arising.
(c) for preventing the use of the road by vehicular traffic
of a kind which, or its use by vehicular traffic in a manner which,
is unsuitable having regard to the existing character of the road
or adjoining property.
Consultations
Formal consultation was carried out between 24th July 2026
and 21st August 2026 which included advertising in the local press
and notices being displayed on site. Divisional county councillors
were consulted along with the council's usual consultees and the
consultation documents posted on the council's
website.
Following formal consultation No Objections were
received.
Decision Maker: Director of Highways and Transport
Decision published: 08/10/2026
Effective from: 22/09/2026
Decision:
Peter Bell, Highway Regulation Manager has taken a decision to approve the Lancashire County Council (Elton Road And Grane Road, Hyndburn And Rossendale Boroughs) (Revocation And 7.5 Tonne Weight Restriction) Order 202*.
Divisions affected: Oswaldtwistle; Rossendale West;
Lead officer: Peter Bell
The proposals
are being pursued as part of a Section 38 agreement under the
Highways Act 1980. These proposals are being funded fully by the
developer and are linked to the new housing
development.
The purpose of the proposed 20mph speed limit is to improve
the safety of motorised and non-motorised users, mitigating against
additional traffic flows and pedestrian movements from new housing
development.
Consultations
Formal consultation was carried out between 29th July 2026
and 26th August 2026 which included advertising in the local press
and notices being displayed on site. Divisional county councillors
were consulted along with the council's usual consultees and the
consultation documents posted on the council's
website.
Following formal consultation No Objections were
received.
Decision Maker: Director of Highways and Transport
Decision published: 08/10/2026
Effective from: 22/09/2026
Decision:
Peter Bell, Highway Regulation Manager has taken a decision to approve the Lancashire County Council (Admarsh Drive And Milestone Drive Areas, Great Eccleston, Wyre Borough) (20mph Speed Limit) Order 202*.
Divisions affected: Wyre Rural Central;
Lead officer: Peter Bell
These proposals
form part of the Levelling Up East Lancashire project. They aim to
deliver improvements in local neighbourhoods through:
• Improving local streets with better connections
through new or improved crossing facilities and
pathways.
• Enhancing streets and public spaces with new planting
and seating.
• Creating safer street environments that makes it
easier for people to walk, cycle or wheel to local
places.
• Improving facilities at local parks and providing new
public green spaces.
• Improving road safety by discouraging pavement parking
at junctions,
• Improving sight lines for people trying to cross the
road and reducing traffic speeds.
The proposals will work together to create a safer
environment for pedestrians, cyclists, and vulnerable users, whilst
also improving public realm in the area. The intention of the
scheme is twofold, to:
• Foster a sense of pride in local communities by
creating safer, greener neighbourhoods and revitalised public
realm.
• Increase active travel uptake to improve health and
wellbeing and reduce health inequalities.
These proposals include the following:
• Introduction of One Way Orders to improve the flow of
traffic and direct local traffic via a safer means of reaching main
arterial roads
REASONS UNDER Section 1 of the RTRA
(a) for avoiding danger to persons or other traffic using the
road or any other road or for preventing the likelihood of any such
danger arising, or
(c) for facilitating the passage on the road or any other
road of any class of traffic (including pedestrians),
or
(f) for preserving or improving the amenities of the area
through which the road runs or
Consultations
Formal consultation was carried out between 14 August 2026
and 11 September 2026 which included advertising in the local press
and notices being displayed on site. Divisional county councillors
were consulted along with the council's usual consultees and the
consultation documents posted on the council's
website.
Following formal consultation No Objections were
received.
Decision Maker: Director of Highways and Transport
Decision published: 08/10/2026
Effective from: 22/09/2026
Decision:
Peter Bell, Highway Regulation Manager has taken a decision to approve the Lancashire County Council (Various Locations, Nelson, Pendle Borough) (Revocation, One Way Traffic And Prohibition Of Turns) Order 202*.
Divisions affected: Nelson East;
Lead officer: Peter Bell
This report presents an application from a local organisation requesting £600 towards A free-to-attend set of events run over two days to be held in Leighton Hall, Yealand School, in the Friends Meeting House and St John's Church in Yealand from the Local Member Grants Scheme.
Decision Maker: Local Councillor Decision - Lancaster Rural North
Decision published: 08/10/2026
Effective from: 08/10/2026
Decision:
County Councillor Graham Dalton considered and rejected a Local Member Grant to Mourholme Local History Society towards the cost of the Yealand History Weekend.
The reason for the rejection is that the date of the event had passed before the councillor made a decision.
Divisions affected: Lancaster Rural North;
Lead officer: Local Member Grants
These proposals
form part of the Levelling Up East Lancashire project. They aim to
deliver improvements in local neighbourhoods through:
• Improving local streets with better connections
through new or improved crossing facilities and
pathways.
• Enhancing streets and public spaces with new planting
and seating.
• Creating safer street environments that makes it
easier for people to walk, cycle or wheel to local
places.
• Improving facilities at local parks and providing new
public green spaces.
• Improving road safety by discouraging pavement parking
at junctions,
• Improving sight lines for people trying to cross the
road and reducing traffic speeds.
The proposals will work together to create a safer
environment for pedestrians, cyclists, and vulnerable users, whilst
also improving public realm in the area. The intention of the
scheme is twofold, to:
• Foster a sense of pride in local communities by
creating safer, greener neighbourhoods and revitalised public
realm.
• Increase active travel uptake to improve health and
wellbeing and reduce health inequalities.
These proposals include the following:
• Introduction of new crossing points for pedestrians,
to facilitate their safe crossing of the road, minimise conflict
with motor vehicles and improve local streets with better
connections
Consultations
Formal consultation was carried out between 14 August 2026
and 11 September 2026 which included advertising in the local press
and notices being displayed on site. Divisional county councillors
were consulted along with the council's usual consultees and the
consultation documents posted on the council's
website.
Following formal consultation No Objections were
received.
Decision Maker: Director of Highways and Transport
Decision published: 08/10/2026
Effective from: 22/09/2026
Decision:
Peter Bell, Highway Regulation Manager has taken a decision to approve the Lancashire County Council (Netherfield Road, Hibson Road and Broad Street, Nelson, Pendle Borough) (Pedestrian Crossings).
Divisions affected: Nelson East;
Lead officer: Peter Bell
These proposals form part of the Levelling Up East Lancashire
project. They aim to deliver improvements in local neighbourhoods
through:
• Improving local streets with better connections
through new or improved crossing facilities and
pathways.
• Enhancing streets and public spaces with new planting
and seating.
• Creating safer street environments that makes it
easier for people to walk, cycle or wheel to local
places.
• Improving facilities at local parks and providing new
public green spaces.
• Improving road safety by discouraging pavement parking
at junctions,
• Improving sight lines for people trying to cross the
road and reducing traffic speeds.
The proposals will work together to create a safer
environment for pedestrians, cyclists, and vulnerable users, whilst
also improving public realm in the area. The intention of the
scheme is twofold, to:
• Foster a sense of pride in local communities by
creating safer, greener neighbourhoods and revitalised public
realm.
• Increase active travel uptake to improve health and
wellbeing and reduce health inequalities.
These proposals include the following:
• Introduction of road humps, raised pedestrian crossing
points and raised junction tables to reduce vehicle speeds and
improve road safety particularly for pedestrians and vulnerable
road users.
• Removal of road humps and raised tables to provide
sufficient gaps between humps in accordance with highway design
standards.
Consultations
Formal consultation was carried out between 14 August 2026
and 11 September 2026 which included advertising in the local press
and notices being displayed on site. Divisional county councillors
were consulted along with the council's usual consultees and the
consultation documents posted on the council's
website.
Following formal consultation No Objections were
received.
Decision Maker: Director of Highways and Transport
Decision published: 08/10/2026
Effective from: 22/09/2026
Decision:
Peter Bell, Highway Regulation Manager has taken a decision to approve the Lancashire County Council (Athol Street, Bracewell Street and Percy Street Areas, Nelson, Pendle Borough) (Removal and Introduction of Road Humps) Legal Reference: LSG4/105387/AFR.
Divisions affected: Nelson East;
Lead officer: Peter Bell
These proposals
form part of the Levelling Up East Lancashire project. They aim to
deliver improvements in local neighbourhoods through:
• Improving local streets with better connections
through new or improved crossing facilities and
pathways.
• Enhancing streets and public spaces with new planting
and seating.
• Creating safer street environments that makes it
easier for people to walk, cycle or wheel to local
places.
• Improving facilities at local parks and providing new
public green spaces.
• Improving road safety by discouraging pavement parking
at junctions,
• Improving sight lines for people trying to cross the
road and reducing traffic speeds.
The proposals will work together to create a safer
environment for pedestrians, cyclists, and vulnerable users, whilst
also improving public realm in the area. The intention of the
scheme is twofold, to:
• Foster a sense of pride in local communities by
creating safer, greener neighbourhoods and revitalised public
realm.
• Increase active travel uptake to improve health and
wellbeing and reduce health inequalities.
•
These proposals include the following:
• Removal and relocation of the existing bus stop
clearways to more suitable positions to accommodate the proposed
pedestrian crossing on Netherfield Road
Consultations
For Bus Stops - Formal consultation was carried out between
14 August 2026 and 11 September 2026 which included frontagers to
the proposed location of the Bus Stop being notified and notices
being displayed on site. Divisional county councillors were
consulted along with the council's usual consultees.
Following formal consultation No Objections were
received.
Decision Maker: Director of Highways and Transport
Decision published: 08/10/2026
Effective from: 22/09/2026
Decision:
Peter Bell, Highway Regulation Manager has taken a decision to approve the Lancashire County Council (Netherfield Road, Nelson, Pendle Borough) (Removal And Introduction Of Bus Stop Clearways) Legal Reference: LSG4/105385/AFR.
Divisions affected: Nelson East;
Lead officer: Peter Bell
A decision taken to appoint an independent auditor of Lancashire Child and Youth Justice Service.
Decision Maker: Director of Children's Social Care
Decision published: 08/10/2026
Effective from: 06/10/2026
Decision:
Louise Anderson, Director of Children’s Social Care, took the decision as set out in the report
Divisions affected: (All Divisions);
Lead officer: Louise Anderson (Director of Children's Social Care)
Approval is sought for the County Council to enter into a Section 106 agreement, under Section 106 of the Town and Country Planning Act 1990, in relation to Chorley Council planning application 25/00476/CB3MAJ which is an outline application with all matters reserved other than access to erect up to 97 dwellings at the Woodlands Conference Centre, Southport Road, Chorley.
Decision Maker: Director of Highways and Transport
Decision published: 08/10/2026
Effective from: 22/09/2026
Decision:
Kirstie Williams, Head of Transport Services and Strategic Partnerships has taken a decision to approve the Section 106 Agreement for Planning Application 25/00476/CB3MAJ. Woodlands Conference Centre Southport Road Chorley PR7 1QR.
Divisions affected: Chorley Central;
Lead officer: Kirstie Williams
This report presents an application from a local organisation requesting £2000 towards a one-off project to improve the current toilet facilities at Ritherham Hall from the Local Member Grants Scheme.
Decision Maker: Local Councillor Decision - Cleveleys South & Carleton
Decision published: 08/10/2026
Effective from: 08/10/2026
Decision:
County Councillor Jan Schofield considered and approved a Local Member Grant of £250 to Thornton Cleveleys Operatic Society towards the cost of one-off project to improve the current toilet facilities at Ritherham Hall.
Divisions affected: Cleveleys East; Cleveleys South & Carleton; Fleetwood East;