A6 Corridor Works, Broughton, Additional Measures

Meeting: 09/08/2018 - Cabinet (Item 10)

10 A6 Corridor Works, Broughton, Additional Measures pdf icon PDF 106 KB

:

Additional documents:

Minutes:

Cabinet received a report on additional measures in line with the renewal of planning consent granted for Broughton Bypass, which included a condition that proposals be developed for cycling, walking and environmental enhancements along the existing A6 Garstang Road, Broughton.

 

Resolved: That the following additional measures along the existing A6 Garstang Road, Broughton, be approved:

  i.  A road narrowing with priority to eastbound traffic and associated relocation of a bus stop, Whittingham Lane, Broughton, as set out in the report

  ii.  An additional length of footway and a cycle track with right of way on foot, Garstang Road, Broughton, as set out in the report.

: